Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Seventh Amendment) Regulations, 2026

JSERC (Rooftop Solar PV Grid Interactive System and Net/ Gross Metering) (Seventh Amendment) Regulations, 2026

AmendmentDated 30 Jan 2026Published in the Gazette 2 Feb 2026Notification No. 125 dated 30rd January,2026

Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Jharkhand State Electricity Regulatory Commission makes the seventh amendment to its 2015 rooftop solar net/gross metering regulations, and it changes only the fee schedule (p1–2).

Regulation 1 carries the short title, the territorial extent (Jharkhand) and the commencement rule: the amendment takes effect from the date of publication in the Government of Jharkhand Gazette, and it holds unless the Commission reviews it earlier or extends it (p1–2). The Gazette issue is dated 2 February 2026 (p1) while the notification itself is dated 30 January 2026 (p1).

Regulation 2 replaces the fee tables in Annexure-II of the Principal Regulations. It sets a three-slab application fee and a matching three-slab registration fee keyed to rooftop solar plant capacity — up to 50 kW / 63 kVA, above 50 kW and up to 1 MWp, and above 1 MWp and up to 2 MWp. Application fees are Rs. 250, Rs. 750 and Rs. 1500; registration fees are Rs. 1000, Rs. 2500 and Rs. 5000 (p2). Both schedules apply equally to an eligible consumer and to a third-party owner other than the owner of the premises (p2).

The instrument is signed by the Commission's Secretary and makes no other change to the Principal Regulations (p2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Fees payable to the Commission

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document