JSERC · Jharkhand State Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — 1st Amendment, 2019
Jharkhand State Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) (1st Amendment), 2019
AmendmentDated 19 Feb 2019Published in the Gazette 26 Feb 2019Notification No. 67 dated The 19thFebruary, 2019
Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The 2019 first amendment revises JSERC’s 2015 rooftop solar net/gross metering framework. It is notified under s.181(2)(x) read with s.50 of the Electricity Act 2003 and applies across Jharkhand, coming into force on Gazette publication (Gazette dated 26 February 2019; notification dated 19 February 2019) (p1). Clauses 1–2 rename and insert load definitions: “connected load” is reclassified and a separate “contracted load/sanctioned load/contract demand” definition is added (p1–2). Clauses 3–13 widen and clarify eligibility: they bring third-party owners with lease or commercial agreements into net/gross metering, make their capacity cumulative across leased premises, bar simultaneous net and gross metering at the same premises, cap rooftop capacity relative to sanctioned load, set an overall eligible capacity band, and address transformer-level capacity and augmentation (p2–3). Clauses 14–20 set procedural and technical rules: application to the Executive Engineer with a copy to JREDA, acknowledgement and priority-list processing timelines, approval timeline, safety compliance under s.53, connectivity levels by load, battery backup permission, and meter location per CEA/JSERC instruments (p3–5). Clauses 21–27 restructure the principal regulations’ chapters and energy accounting: deemed banking for pre-COD injection, deemed purchase of unutilized banked energy at pooled power purchase cost, monthly settlement, compensation at Commission-notified tariff-order rates with fallback to previous rates, reset of carried-over credits, and no deemed generation charges; they add a power to remove difficulties (p5–7). Clause 28 revises application and registration fees by load slab (p7–8). Clauses 29–32 update annexure references and model interconnection agreements for eligible consumers and third-party owners, replacing “eligible consumer” and “Licensee” with “First Party” and “Second Party” in one annexure (p8–9).
Read with this
The regulation
Amendments and corrections
- Dated 31 Dec 2020Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — Second Amendment, 2020
- Dated 22 Nov 2023Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Third Amendment) Regulations, 2023
- Dated 29 May 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Fourth Amendment) Regulations, 2024
- Dated 26 Nov 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Fifth Amendment, 2024
- Dated 17 Apr 2025Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Sixth Amendment, 2025
- Dated 30 Jan 2026Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Seventh Amendment) Regulations, 2026
Procedures and orders made under it
- Date not statedRooftop Solar PV Gross/Net Metering Tariff, FY 2018-19