JSERC · Jharkhand State Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — 1st Amendment, 2019

Jharkhand State Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) (1st Amendment), 2019

AmendmentDated 19 Feb 2019Published in the Gazette 26 Feb 2019Notification No. 67 dated The 19thFebruary, 2019

Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The 2019 first amendment revises JSERC’s 2015 rooftop solar net/gross metering framework. It is notified under s.181(2)(x) read with s.50 of the Electricity Act 2003 and applies across Jharkhand, coming into force on Gazette publication (Gazette dated 26 February 2019; notification dated 19 February 2019) (p1). Clauses 1–2 rename and insert load definitions: “connected load” is reclassified and a separate “contracted load/sanctioned load/contract demand” definition is added (p1–2). Clauses 3–13 widen and clarify eligibility: they bring third-party owners with lease or commercial agreements into net/gross metering, make their capacity cumulative across leased premises, bar simultaneous net and gross metering at the same premises, cap rooftop capacity relative to sanctioned load, set an overall eligible capacity band, and address transformer-level capacity and augmentation (p2–3). Clauses 14–20 set procedural and technical rules: application to the Executive Engineer with a copy to JREDA, acknowledgement and priority-list processing timelines, approval timeline, safety compliance under s.53, connectivity levels by load, battery backup permission, and meter location per CEA/JSERC instruments (p3–5). Clauses 21–27 restructure the principal regulations’ chapters and energy accounting: deemed banking for pre-COD injection, deemed purchase of unutilized banked energy at pooled power purchase cost, monthly settlement, compensation at Commission-notified tariff-order rates with fallback to previous rates, reset of carried-over credits, and no deemed generation charges; they add a power to remove difficulties (p5–7). Clause 28 revises application and registration fees by load slab (p7–8). Clauses 29–32 update annexure references and model interconnection agreements for eligible consumers and third-party owners, replacing “eligible consumer” and “Licensee” with “First Party” and “Second Party” in one annexure (p8–9).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Energy accounting and settlement

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document