JSERC (Rooftop Solar PV Grid Interactive System and Net/ Gross Metering) (Sixth Amendment) Regulations, 2025

AmendmentDated 17 Apr 2025Published in the Gazette 14 May 2025Notification No. 106 dated 17th April, 2025

Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment to the JSERC (Rooftop Solar PV Grid Interactive System and Net/Gross Metering) Regulations, 2015 — the State's principal framework for grid-connected rooftop solar and net/gross metering (p1). It is a short, two-page instrument that rewrites only two clauses of the Principal Regulations, both aimed at simplifying and speeding up the consumer-facing process.

Section 1 gives the title, confines the amendment to Jharkhand, and brings it into force from gazette publication unless the Commission reviews or extends it earlier (p1–2). Section 2 substitutes Clause 7.1, restating the application route — application form and fees per the Principal Regulations' annexures, forms to be published on the licensee's website and at local offices — and carving out PM Surya Ghar: Muft Bijli Yojana applicants who apply through the National portal, for whom no application or registration fee applies (p2).

Section 3 substitutes Clause 7.13, which governs execution of the interconnection agreement for net-metering applicants: the Distribution Licensee must execute it within fifteen days of issuing the registration number, but PM Surya Ghar applicants may be exempt from executing it. A proviso then imposes technical conditions — an isolation device with licensee access, automatic disconnection on licensee outage, and compliance with IEEE/IEC or BIS standards and the CEA (Measures of Safety and Electricity Supply) Regulations, 2010 (p2).

The gazette carrying it is dated 14 May 2025, later than the notification date of 17 April 2025 (p1).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Technical standards, Electrical safety

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document