JSERC · Jharkhand State Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Sixth Amendment, 2025
JSERC (Rooftop Solar PV Grid Interactive System and Net/ Gross Metering) (Sixth Amendment) Regulations, 2025
AmendmentDated 17 Apr 2025Published in the Gazette 14 May 2025Notification No. 106 dated 17th April, 2025
Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sixth Amendment to the JSERC (Rooftop Solar PV Grid Interactive System and Net/Gross Metering) Regulations, 2015 — the State's principal framework for grid-connected rooftop solar and net/gross metering (p1). It is a short, two-page instrument that rewrites only two clauses of the Principal Regulations, both aimed at simplifying and speeding up the consumer-facing process.
Section 1 gives the title, confines the amendment to Jharkhand, and brings it into force from gazette publication unless the Commission reviews or extends it earlier (p1–2). Section 2 substitutes Clause 7.1, restating the application route — application form and fees per the Principal Regulations' annexures, forms to be published on the licensee's website and at local offices — and carving out PM Surya Ghar: Muft Bijli Yojana applicants who apply through the National portal, for whom no application or registration fee applies (p2).
Section 3 substitutes Clause 7.13, which governs execution of the interconnection agreement for net-metering applicants: the Distribution Licensee must execute it within fifteen days of issuing the registration number, but PM Surya Ghar applicants may be exempt from executing it. A proviso then imposes technical conditions — an isolation device with licensee access, automatic disconnection on licensee outage, and compliance with IEEE/IEC or BIS standards and the CEA (Measures of Safety and Electricity Supply) Regulations, 2010 (p2).
The gazette carrying it is dated 14 May 2025, later than the notification date of 17 April 2025 (p1).
Read with this
The regulation
Amendments and corrections
- Dated 19 Feb 2019Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — 1st Amendment, 2019
- Dated 31 Dec 2020Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — Second Amendment, 2020
- Dated 22 Nov 2023Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Third Amendment) Regulations, 2023
- Dated 29 May 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Fourth Amendment) Regulations, 2024
- Dated 26 Nov 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Fifth Amendment, 2024
- Dated 30 Jan 2026Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Seventh Amendment) Regulations, 2026
Procedures and orders made under it
- Date not statedRooftop Solar PV Gross/Net Metering Tariff, FY 2018-19
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.