Skip to content

HERC · Haryana Electricity Regulatory Commission

Electricity Supply Code Regulations, 2014 — 2nd Amendment, 2019

Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (2nd Amendment) Regulations, 2019

AmendmentDated 8 Jan 2020HERC/ 29/ 2014/ 2nd Amendment / 2019 dated The 8th January 2020

Amends the Haryana Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HERC's second amendment to the Haryana Electricity Supply Code, 2014, notified on 8 January 2020 under s.50 read with s.181(2) of the Electricity Act 2003 (p1). It takes effect from the date of Gazette publication — no Gazette date is printed — and extends to the whole State (p1). Rather than a new code, it rewrites roughly twenty provisions of the Principal Regulations, grouped by subject.

Definitions and metering (pp1–6). A substituted definition of "consumer premises" excludes the outside face of the boundary wall, and a proviso adds a definition of "smart meter" (p1). The licensee must install smart meters in phases within National Tariff Policy 2016 timelines with Commission approval (p4); meter cost falls on the consumer with no meter security or rental, and a real-time display unit is to be provided where the meter sits outside the premises (p4). Responsibility for meter upkeep is shared, and Regulation 5.7 is wholly replaced with a cost-of-replacement regime for defective, burnt or stolen meters, allocating cost between licensee and consumer by cause, providing for third-party testing and refund of testing fees (pp5–6).

New connections and works (pp1–4). Voltage other than the approved plan needs Commission approval; where 33 kV is unavailable, load above 5 MVA up to 8 MVA may be served at 11 kV, and where an intermediate voltage is unavailable, load up to 37.5 MVA may be served at 33 kV, with the consumer bearing the cost difference (p1–2). Demand-notice contents, transformer repair cost sharing, supervision charges, cancellation of the application after 15 days' notice, and a penalty on legal heirs who delay a change-of-name application are set out (pp2–3).

Billing and payment (pp6–7). Billing periodicity is prescribed by consumer category, an e-bill rebate is introduced, and due dates are fixed by billing mode and consumer class.

Unauthorized load and grievances (pp7–8). A new agriculture clause treats load exceeding sanctioned load by more than 10% as unauthorized and prescribes a per-BHP monthly penalty. Regulation 15 is replaced so that complaints follow the 2019 consumer grievance-redressal regulations and compensation follows the 2004 Standards of Performance Regulations (p8).

Standard name
Electricity Supply Code
Primary topics
Metering, New connections and load changes, Billing and payment

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document