HERC · Haryana Electricity Regulatory Commission

Haryana Electricity Supply Code, 2014

The Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014

CodeDated 8 Jan 2014Regulation No. HERC/29/2014- dated The 8th January, 2014

7 amendments to it are on Voltaic, the latest dated 22 Jul 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software, from pages 1 to 29 of 77. Check the regulator's original before you rely on it.

The Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (HERC/29/2014), notified on 8 January 2014, is a principal state regulation made under Sections 50 and 181(2)(x) of the Electricity Act, 2003. It comes into force from the date of publication in the official Gazette of Haryana.

Chapter 1 states the scope: distribution and retail supply licensees, deemed licensees and all consumers in Haryana; persons exempted under Section 13 of the Act; and cases of unauthorized supply, unauthorized use, diversion and abstraction (p1). Chapter 2 (p2–6) sets definitions and interpretation rules for the Code. Chapter 3 (p7–8) specifies the system of supply, voltage/load categories, load balancing, classification of consumers, and charge categories recoverable under tariff orders.

Chapter 4 (p9–29) is the operative core. It covers the licensee's duty to supply and to strengthen/augment the distribution system, recovery of connection costs, change of ownership, sub-division and reconstruction of premises, and the full new-connection process: application, inspection, demand notice, testing, service connection order and release, with voltage-based timelines (p9–17). It then specifies temporary supply, modification/change in existing connections, change of name, conversion of services, load clubbing, shifting of meter/connection, reclassification, load enhancement and reduction (p18–25). Sections 4.14–4.16 cover agreement execution and general conditions of supply: connected load, demand notice validity and extension, point of supply, security deposit, interest and review, payment modes, and service-line/apparatus arrangements (p25–29).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.