HERC · Haryana Electricity Regulatory Commission

Electricity Supply Code, 2014 — 1st Amendment, 2014

The Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 1st Amendment, 2014

AmendmentDated 17 Nov 2014HERC/29/2014/1st Amendment/2014- dated The 17th November, 2014

Amends the Haryana Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HERC's first amendment to its 2014 Electricity Supply Code, notified 17 November 2014, makes five changes to the principal regulations. Section 1 (p1) names the instrument, says it takes effect from Gazette publication, and extends it to all distribution and retail supply licensees (including deemed licensees) and all consumers in Haryana, to persons exempted under s.13 of the Act, and to cases of unauthorized supply, use, diversion or abstraction of electricity.

Section 2 (p2) replaces Regulation 3.2.1's voltage-of-supply schedule, re-banding the system of supply (single-phase 230 V, three-phase 400 V, then 11 / 33 / 66 / 132 / 220 / 400 kV) by contracted load, and replaces Regulation 3.2.2 with provisos allowing supply at a non-standard voltage with the Commission's approval and letting an existing consumer who reduces load stay at the same voltage provided the reduced load remains in the High Tension category.

Section 3 (p3) replaces Regulation 4.7.2(1) on change of name of a registered consumer: application in the prescribed form with a paid bill, settlement of all dues, proof of ownership/occupancy and processing under Regulation 4.6.2, with provisos routing sale/lease cases to Regulation 4.3.1 and requiring an undertaking that the applicant will pay the previous owner's arrears, including those detected later on audit.

Section 4 (p3–4) replaces Regulation 4.15.5, putting interest on consumer security deposits at the RBI Bank rate as on 1 April each year (or more if the Commission specifies), payable annually and adjusted in the first billing cycle of the following financial year. Section 5 (p4) deletes Regulation 7.9 on voluntary declaration of tampered meters/seals, with no replacement.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Security deposit

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document