HERC · Haryana Electricity Regulatory Commission

Electricity Supply Code Regulations, 2014 — 4th Amendment, 2024

Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2014. (4th Amendment) Regulation, 2024

AmendmentDated 15 Jan 2024Regulation No. HERC/29/2014/4th Amendment/2024 dated The 15th January, 2024

Amends the Haryana Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the fourth amendment to the HERC (Electricity Supply Code) Regulations, 2014, issued by the Haryana Electricity Regulatory Commission on 15 January 2024 and numbered HERC/29/2014/4th Amendment/2024 (p1). It makes one substantive change: substituting the Note under Regulation 4.4.3(2)(c) (p1).

The substituted Note governs who pays when a distribution transformer installed by a consumer and used exclusively for his own LT supply (other than a domestic connection) has to be repaired or replaced. It fixes a consumer/licensee cost split of 20%/80% for replacement within the warranty period and 10%/90% beyond it, and places the entire cost on the licensee where the damage is due to natural events such as cyclone, floods or storms or other occurrences beyond the consumer's control (p1).

Page 2 carries two provisos: if the applicant chooses to have the work done at his own cost, the licensee may charge only supervision charges at 1.5% of the estimated cost of works to be handed over to the licensee; and if the applicant does the work himself, he must finish within the timeframes in Regulations 4.4.6 and 4.4.7, failing which the licensee may cancel the supply application after 15 days' notice (p2).

The amendment takes effect from the date of publication in the Haryana Government Gazette; that date is not printed in the document (p1).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document