HERC · Haryana Electricity Regulatory Commission

Electricity Supply Code Regulations, 2014 — 6th Amendment, 2025

Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (6th Amendment) Regulation, 2025

AmendmentDated 25 Jul 2025Published in the Gazette 5 Aug 2025HERC/29/2014/6th Amendment/2025 dated The 25th July, 2025

Amends the Haryana Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the sixth amendment to the HERC (Electricity Supply Code) Regulations, 2014, issued as Gazette notification HERC/29/2014/6th Amendment/2025 dated 25 July 2025 and published in the Haryana Government Gazette on 5 August 2025 (p1). It comes into force from the date of Gazette publication and extends to the whole of Haryana (p1, cl. 1.1–1.3). It amends the Principal Regulations as already amended five times.

Clause 2.1 substitutes Regulation 4.4.3(2)(c), governing the case where a supply applicant elects to carry out the works at his own cost. It requires the work to be done through a Licensed Electrical Contractor, requires the consumer to procure material conforming to BIS specifications (ISI or successor mark) and to the licensee's standards, and caps what the licensee may charge as supervision charges. A proviso fixes the supervision charge as a percentage of the estimated cost of works finally handed over to the licensee or approved by the Commission. A second proviso ties completion to the Regulation 4.4.7 timeline and lets the licensee cancel the application after 15 days' notice on default (p1–2).

Clause 2.2 substitutes Regulation 4.10.1 on shifting of meters/service lines, requiring applications in the prescribed form and processing per Regulation 4.6.2, with site inspection and demand notice following the Regulation 4.4.2(5)–4.4.4 procedure and timelines. Its proviso makes the licensee bear the cost of shifting an Agricultural Power connection in defined situations within a set radius on the same owner's land, recovered through the Annual Revenue Requirement (p2).

Standard name
Electricity Supply Code
Primary topics
Connection and miscellaneous charges, New connections and load changes, Technical standards

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.