HERC · Haryana Electricity Regulatory Commission
Electricity Supply Code Regulations, 2014 — 6th Amendment, 2025
Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (6th Amendment) Regulation, 2025
AmendmentDated 25 Jul 2025Published in the Gazette 5 Aug 2025HERC/29/2014/6th Amendment/2025 dated The 25th July, 2025
Amends the Haryana Electricity Supply Code, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the sixth amendment to the HERC (Electricity Supply Code) Regulations, 2014, issued as Gazette notification HERC/29/2014/6th Amendment/2025 dated 25 July 2025 and published in the Haryana Government Gazette on 5 August 2025 (p1). It comes into force from the date of Gazette publication and extends to the whole of Haryana (p1, cl. 1.1–1.3). It amends the Principal Regulations as already amended five times.
Clause 2.1 substitutes Regulation 4.4.3(2)(c), governing the case where a supply applicant elects to carry out the works at his own cost. It requires the work to be done through a Licensed Electrical Contractor, requires the consumer to procure material conforming to BIS specifications (ISI or successor mark) and to the licensee's standards, and caps what the licensee may charge as supervision charges. A proviso fixes the supervision charge as a percentage of the estimated cost of works finally handed over to the licensee or approved by the Commission. A second proviso ties completion to the Regulation 4.4.7 timeline and lets the licensee cancel the application after 15 days' notice on default (p1–2).
Clause 2.2 substitutes Regulation 4.10.1 on shifting of meters/service lines, requiring applications in the prescribed form and processing per Regulation 4.6.2, with site inspection and demand notice following the Regulation 4.4.2(5)–4.4.4 procedure and timelines. Its proviso makes the licensee bear the cost of shifting an Agricultural Power connection in defined situations within a set radius on the same owner's land, recovered through the Annual Revenue Requirement (p2).
Read with this
The regulation
- Dated 8 Jan 2014Haryana Electricity Supply Code, 2014
Amendments and corrections
- Dated 17 Nov 2014Electricity Supply Code, 2014 — 1st Amendment, 2014
- Dated 8 Jan 2020Electricity Supply Code Regulations, 2014 — 2nd Amendment, 2019
- Dated 15 Nov 2023Electricity Supply Code Regulations, 2014 — 3rd Amendment, 2023
- Dated 15 Jan 2024Electricity Supply Code Regulations, 2014 — 4th Amendment, 2024
- Dated 1 Aug 2024Haryana Electricity Supply Code Regulations, 2014 — 5th Amendment, 2024
- Dated 22 Jul 2026Electricity Supply Code Regulations, 2014 — 7th Amendment, 2026
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.