Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2014

AmendmentDated 4 Mar 2014In force from 1 Apr 2014Notification No. 1of 2014 dated 4/03/2014

Amends the Intra-State Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the GERC (Terms and Conditions of Intra-State Open Access) Regulations, 2011, issued as Notification No. 1 of 2014 and signed by the Secretary on 4 March 2014 at Gandhinagar (p2). It makes two changes to the principal regulations and applies to the whole state of Gujarat, coming into force on 1 April 2014 (p1).

The first change replaces the definition of Short-Term Open Access in Regulation 3(s), so that short-term open access now means open access for a period up to one month at a time (p1). This narrows the earlier definition embedded in the principal regulations.

The second change substitutes Regulation 21(2)(ii), which sets out how transmission charges payable by short-term open access customers are to be computed (pp1–2). The substituted clause prescribes a formula expressed per MW per day, built from the total transmission cost determined by the Commission for the relevant year and the sum of capacities allocated to all long-term and medium-term open access customers. It also specifies that short-term transmission charges are payable on the basis of the maximum capacity reserved for such customers (p2).

Only these two provisions are touched; everything else in the 2011 principal regulations continues to apply. The document does not restate the principal regulations and contains no schedules, forms or annexures.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Transmission tariff

Read with this

The regulation

Amendments and corrections

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document