GERC · Gujarat Electricity Regulatory Commission
Terms and Conditions of Intra-State Open Access Regulations, 2013 — First Amendment — Draft
Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2013
Draft amendmentDated 21 Nov 2013Notification No. of 2013 dated 21/11/2013
Draft
A proposal that has since been finalised as the Terms and Conditions of Intra-State Open Access Regulations, 2011 — First Amendment, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft first amendment, issued by the Gujarat Electricity Regulatory Commission, to its 2011 Intra-State Open Access Regulations (p1). The text says the Commission "hereby proposes to make" the regulations, and the draft is signed by the Secretary at Gandhinagar on 21/11/2013 (p2). No notification number is filled in — the heading reads only "Notification No. of 2013" (p1).
Regulation 1 sets the title, provides for commencement on the date of publication in the Government Gazette (the Gazette date is not printed), and extends the amendment to the whole state of Gujarat (p1).
Regulation 2 replaces the definition of "Short-Term Open Access" in Regulation 3(s) of the Principal Regulations, defining it as open access for a period up to one month at a time (pp1–2).
Regulation 3 substitutes Regulation 21(2)(ii), which governs how transmission charges are computed for short-term open access customers. The charge is derived from the total transmission cost determined by the Commission for the relevant year and divided across the capacities allocated to all long-term and medium-term open access customers, expressed per MW per day. A proviso requires short-term charges to be paid on the maximum capacity reserved for such customers (p2).
No other provision of the Principal Regulations is touched.
Read with this
The regulation
- Dated 31 May 2011Intra-State Open Access Regulations, 2011
Amendments and corrections
- Dated 4 Mar 2014Terms and Conditions of Intra-State Open Access Regulations, 2011 — First Amendment, 2014
- Dated 12 Aug 2014Terms and Conditions of Intra-State Open Access (Second Amendment) Regulations, 2014
- Dated 20 Feb 2024Changes some provisions: Green Energy Open Access Regulations, 2024
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.