Skip to content

GERC · Gujarat Electricity Regulatory Commission

Terms and Conditions of Intra-State Open Access (Second Amendment) Regulations, 2014

Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2014

AmendmentDated 12 Aug 2014Notification No. 3 of 2014 dated 12/08/2014

Amends the Intra-State Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page amendment by the Gujarat Electricity Regulatory Commission to the State's intra-state open access regulations. It was issued as Notification No. 3 of 2014, signed at Gandhinagar on 12 August 2014, and comes into force from the date of its Gazette publication (that date is not printed in the text); it extends to the whole of Gujarat (p1).

The operative change is narrow: Regulation 21(2)(ii) of the Principal Regulations is substituted in full, restating how transmission charges payable by Short-Term Open Access customers are to be determined (p1–2). The substituted text defines the two inputs to that determination — Total Transmission Cost as determined by the Commission for the relevant year, and the sum of capacities allocated to all long-term and medium-term open access customers in MW — and adds a proviso that short-term transmission charges are payable on the basis of energy actually scheduled for short-term transactions (p2).

Nothing else in the open access framework is touched, so the document matters only for short-term open access transmission pricing and for the definition of the allocation base used in it.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges

Read with this

The regulation

Amendments and corrections

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document