GERC · Gujarat Electricity Regulatory Commission
Terms and Conditions of Intra-State Open Access (Second Amendment) Regulations, 2014
Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2014
AmendmentDated 12 Aug 2014Notification No. 3 of 2014 dated 12/08/2014
Amends the Intra-State Open Access Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page amendment by the Gujarat Electricity Regulatory Commission to the State's intra-state open access regulations. It was issued as Notification No. 3 of 2014, signed at Gandhinagar on 12 August 2014, and comes into force from the date of its Gazette publication (that date is not printed in the text); it extends to the whole of Gujarat (p1).
The operative change is narrow: Regulation 21(2)(ii) of the Principal Regulations is substituted in full, restating how transmission charges payable by Short-Term Open Access customers are to be determined (p1–2). The substituted text defines the two inputs to that determination — Total Transmission Cost as determined by the Commission for the relevant year, and the sum of capacities allocated to all long-term and medium-term open access customers in MW — and adds a proviso that short-term transmission charges are payable on the basis of energy actually scheduled for short-term transactions (p2).
Nothing else in the open access framework is touched, so the document matters only for short-term open access transmission pricing and for the definition of the allocation base used in it.
Read with this
The regulation
- Dated 31 May 2011Intra-State Open Access Regulations, 2011
Amendments and corrections
- Dated 4 Mar 2014Terms and Conditions of Intra-State Open Access Regulations, 2011 — First Amendment, 2014
- Dated 20 Feb 2024Changes some provisions: Green Energy Open Access Regulations, 2024
Earlier drafts
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.