Summary
Summary written by software, from pages 1 to 20 of 28. Check the regulator's original before you rely on it.
What it is. GERC's consolidated framework for green energy open access (GEOA) in Gujarat, notified as Notification No. 08 of 2024 in the Gujarat Government Gazette (Extraordinary, Part IV-C) of 21 February 2024 (p1). It is made under Section 181 read with Sections 39, 40, 42, 61 and 86 of the Electricity Act, 2003, and gives effect in Gujarat to the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 (p1, p3, p12). It extends to the whole State and takes effect from Gazette notification (p2).
Who and what it covers. Regulations 1–5 open GEOA to licensees, green energy generators and consumers with contract demand or sanctioned load of 100 kW or more, taken singly or aggregated across connections in the same electricity division (p1, p3, p5), with no load ceiling for captive RE projects. "Green energy" is defined broadly — renewables including hydro and renewable-backed storage, plus green hydrogen/ammonia and non-fossil-fuel municipal waste-to-energy (p3–4). Regulation 5 confirms the scope is intra-State transmission and/or distribution systems, including those incidental to inter-State transmission (p4).
Getting access. Regulations 6–9 set entry conditions: planning-criteria-based long-term access, margin-based short/medium-term access, metering prerequisites by capacity, a no-dues test, duration bands for long/medium/short-term access, and an application route through the Central Nodal Agency portal. Regulation 9 is the heaviest — captive consumers must prove captive status annually with equity and consumption details by 31 October (p6), failing which captive benefits can be withdrawn and cross-subsidy and additional surcharge recovered. Regulation 10 splits the State Nodal Agency role between SLDC, STU and the distribution licensee by access duration and network; Regulations 11–12 preserve the old control-period regime for plants commissioned before notification and lay down allotment priority. Regulation 13 gives the T0-based processing timeline (pp8–11), processing fees and bank guarantees, deemed execution of transmission/wheeling agreements, and a 24-month commissioning deadline; Regulation 14 covers day-ahead transactions; Regulation 15 covers relinquishment of rights.
Charges and energy accounting. Regulation 16 routes inter-state accounting to CERC regulations and intra-state deviation to GERC's 2019 forecasting/scheduling/DSM rules (pp13–14). Regulation 17 is the pricing core (pp14–20): transmission and wheeling charges as determined in tariff orders, cross-subsidy and additional surcharge with captive, waste-to-energy and offshore-wind relief, standby charges, the banking facility and banking charges, the hierarchy for settling energy from multiple RE sources, scheduling/transaction/meter-reading fees, payment security through letter of credit or bank guarantee, and compensation for relinquishment. Regulation 1(4) and 17.6(viii) fix the banking charge only until 30 September 2024, leaving the later rate to a separate notification (p2, p17).
Operations. Regulation 18 sets the curtailment order (non-green consumers first, distribution licensees last, pro-rata within category), Regulation 19 routes disputes to the nodal agency with appeal to the Commission, and Regulation 20 sets metering standards (p20).
Read with this
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.