Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024

Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024.

RegulationDated 20 Feb 2024Published in the Gazette 21 Feb 2024GERC/2024/08/Legal/0466

6 amendments to it are on Voltaic, the latest dated 19 Aug 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 20 of 28. Check the regulator's original before you rely on it.

What it is. GERC's consolidated framework for green energy open access (GEOA) in Gujarat, notified as Notification No. 08 of 2024 in the Gujarat Government Gazette (Extraordinary, Part IV-C) of 21 February 2024 (p1). It is made under Section 181 read with Sections 39, 40, 42, 61 and 86 of the Electricity Act, 2003, and gives effect in Gujarat to the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 (p1, p3, p12). It extends to the whole State and takes effect from Gazette notification (p2).

Who and what it covers. Regulations 1–5 open GEOA to licensees, green energy generators and consumers with contract demand or sanctioned load of 100 kW or more, taken singly or aggregated across connections in the same electricity division (p1, p3, p5), with no load ceiling for captive RE projects. "Green energy" is defined broadly — renewables including hydro and renewable-backed storage, plus green hydrogen/ammonia and non-fossil-fuel municipal waste-to-energy (p3–4). Regulation 5 confirms the scope is intra-State transmission and/or distribution systems, including those incidental to inter-State transmission (p4).

Getting access. Regulations 6–9 set entry conditions: planning-criteria-based long-term access, margin-based short/medium-term access, metering prerequisites by capacity, a no-dues test, duration bands for long/medium/short-term access, and an application route through the Central Nodal Agency portal. Regulation 9 is the heaviest — captive consumers must prove captive status annually with equity and consumption details by 31 October (p6), failing which captive benefits can be withdrawn and cross-subsidy and additional surcharge recovered. Regulation 10 splits the State Nodal Agency role between SLDC, STU and the distribution licensee by access duration and network; Regulations 11–12 preserve the old control-period regime for plants commissioned before notification and lay down allotment priority. Regulation 13 gives the T0-based processing timeline (pp8–11), processing fees and bank guarantees, deemed execution of transmission/wheeling agreements, and a 24-month commissioning deadline; Regulation 14 covers day-ahead transactions; Regulation 15 covers relinquishment of rights.

Charges and energy accounting. Regulation 16 routes inter-state accounting to CERC regulations and intra-state deviation to GERC's 2019 forecasting/scheduling/DSM rules (pp13–14). Regulation 17 is the pricing core (pp14–20): transmission and wheeling charges as determined in tariff orders, cross-subsidy and additional surcharge with captive, waste-to-energy and offshore-wind relief, standby charges, the banking facility and banking charges, the hierarchy for settling energy from multiple RE sources, scheduling/transaction/meter-reading fees, payment security through letter of credit or bank guarantee, and compensation for relinquishment. Regulation 1(4) and 17.6(viii) fix the banking charge only until 30 September 2024, leaving the later rate to a separate notification (p2, p17).

Operations. Regulation 18 sets the curtailment order (non-green consumers first, distribution licensees last, pro-rata within category), Regulation 19 routes disputes to the nodal agency with appeal to the Commission, and Regulation 20 sets metering standards (p20).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document