GERC · Gujarat Electricity Regulatory Commission
Intra-State Open Access Regulations, 2011
Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2011
RegulationDated 31 May 2011Notification No. 3 of 2011
2 amendments to it are on Voltaic, the latest dated 12 Aug 2014.
A later regulation on Voltaic changes some of its provisions: Green Energy Open Access Regulations, 2024.
Summary
Summary written by software, from pages 1 to 39 of 75. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2011, Notification No. 3 of 2011, are the principal GERC framework for using Gujarat's intra-state transmission and distribution systems under open access. They commence on Gazette publication and extend to Gujarat (p1).
Chapter 1 (pp1–5) defines the vocabulary and interpretation rules. Chapter 2 (pp6–11) creates connectivity: a consumer with load of 4 MW and above or a generating station of 4 MW and above may connect to the intra-state transmission system; smaller generating stations connect to distribution; distribution licensees may seek connectivity. It sets application routes, fees, STU/distribution processing, connection agreements, and the rule that connectivity alone does not confer open access (pp6–11). Chapter 3 (pp12–13) makes licensees, generators, captive plants and consumers eligible for open access on payment of Commission-determined charges, with a 1 MW and above threshold for consumers and a captive exemption; it bars insolvent/defaulting applicants and requires ABT meters and RTU (pp12–13).
Chapter 4 contains the application and approval machinery. Regulation 11 classifies customers by connected system, location of injection/drawal, and duration. Regulation 12 and Tables 1–2 (pp15–29) set the nodal agency, fee bands, documents, disposal timelines, charge heads, loss treatment and settlement for short-, medium- and long-term open access by location, including inter-state cases routed to CERC. Regulations 13–15 (pp30–39) give the LTA, MTOA and STOA procedures: bank guarantees and agreements for LTA; the MTOA application window and agreement; and STOA advance, day-ahead, contingency and electronic bidding procedures, with FORMAT-ST1 to ST4.
Read with this
Amendments and corrections
- Dated 4 Mar 2014Terms and Conditions of Intra-State Open Access Regulations, 2011 — First Amendment, 2014
- Dated 12 Aug 2014Terms and Conditions of Intra-State Open Access (Second Amendment) Regulations, 2014
- Dated 20 Feb 2024Changes some provisions: Green Energy Open Access Regulations, 2024
Earlier drafts
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.