Skip to content

GERC · Gujarat Electricity Regulatory Commission

Intra-State Open Access Regulations, 2011

Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2011

RegulationDated 31 May 2011Notification No. 3 of 2011

2 amendments to it are on Voltaic, the latest dated 12 Aug 2014.

A later regulation on Voltaic changes some of its provisions: Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 39 of 75. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2011, Notification No. 3 of 2011, are the principal GERC framework for using Gujarat's intra-state transmission and distribution systems under open access. They commence on Gazette publication and extend to Gujarat (p1).

Chapter 1 (pp1–5) defines the vocabulary and interpretation rules. Chapter 2 (pp6–11) creates connectivity: a consumer with load of 4 MW and above or a generating station of 4 MW and above may connect to the intra-state transmission system; smaller generating stations connect to distribution; distribution licensees may seek connectivity. It sets application routes, fees, STU/distribution processing, connection agreements, and the rule that connectivity alone does not confer open access (pp6–11). Chapter 3 (pp12–13) makes licensees, generators, captive plants and consumers eligible for open access on payment of Commission-determined charges, with a 1 MW and above threshold for consumers and a captive exemption; it bars insolvent/defaulting applicants and requires ABT meters and RTU (pp12–13).

Chapter 4 contains the application and approval machinery. Regulation 11 classifies customers by connected system, location of injection/drawal, and duration. Regulation 12 and Tables 1–2 (pp15–29) set the nodal agency, fee bands, documents, disposal timelines, charge heads, loss treatment and settlement for short-, medium- and long-term open access by location, including inter-state cases routed to CERC. Regulations 13–15 (pp30–39) give the LTA, MTOA and STOA procedures: bank guarantees and agreements for LTA; the MTOA application window and agreement; and STOA advance, day-ahead, contingency and electronic bidding procedures, with FORMAT-ST1 to ST4.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.