MERC · Maharashtra Electricity Regulatory Commission
Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft
Maharashtra Electricity Regulatory Commission (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024
Draft regulationDated 27 Aug 2024No. MERC /Tech/Regulations/2024/XXX dated 27August 2024
Draft
A proposal that has since been finalised as the Demand Flexibility and Demand Side Management Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC regulation, issued on the Commission's letterhead in August 2024 and signed by the Secretary on 27 August 2024, with a placeholder notification number (p1, p3, p19). It sets a three-part framework for demand flexibility (DF) and demand-side management (DSM) by distribution licensees in Maharashtra. It applies to all existing and prospective distribution licensees and comes into force on Gazette publication; the Gazette date is not printed (p3). Regulation 1 says it is to be read harmoniously with the MERC MYT Regulations, 2024 and the MERC Resource Adequacy Regulations, 2024 (p3). Definitions run from p3–6.
Part A (Regulations 3–6, p7–11) makes DF/DSM part of day-to-day licensee operations. It requires a rolling five-year and one-year portfolio built on load research, with programme design, cost-effectiveness analysis, EM&V arrangements and a funding plan. It sets a five-year DFPO trajectory as a share of peak demand and a continuing obligation thereafter; it also provides a symmetric incentive and disincentive per MW of over- or under-achievement (p9). It lists priority programme areas — irrigation and municipal pumping, smart EV charging, behind-the-meter storage, heat pumps and thermal storage — and requires public disclosure (p9–10). A separately notified DSM Consultation Committee, convened by the Secretary, reviews portfolios and status reports (p10). Costs are recovered through MYT/ARR filings, with a possible future DF-DSM charge (p11).
Part B (Regulations 7–11, p12–15) sets the screening sequence: TRC as the main hurdle, then RIM, with an LRIRIM tariff-impact cap; it gives formulas for benefits and costs, treatment of losses and avoided power purchase, default input values, and the option for the Commission to revise those values annually. Part C (Regulations 12–17, p16–19) sets EM&V principles and three evaluation types, impact-evaluation methods (IPMVP, deemed savings, large-scale data analysis), process and market-effect evaluation, IVA empanelment criteria and minimum EM&V report contents.
Regulations 18–20 (p19) give the Commission powers to remove difficulties, issue orders/practice directions and amend. Annexure 1 (p20–23) prescribes the portfolio/implementation-plan format and programme-document elements; Annexure 2 (p24–25) sets out PCT and SCT methods; Annexure 3 (p27) describes IPMVP options A–D.
Read with this
The regulation
- Dated 19 Nov 2024Demand Flexibility and Demand Side Management Regulations, 2024
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
- Released with the notice dated 27 Aug 2024Explanatory memorandum: Draft Demand Flexibility and Demand Side Management Regulations, 2024 — Explanatory Memorandum
- Dated 27 Aug 2024Public notice: Public Notice — Comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
- Dated 25 Sep 2024Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.