Draft Demand Flexibility and Demand Side Management Regulations, 2024 — Explanatory Memorandum

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION EXPLANATORY MEMORANDUM (EM) On DRAFT MERC (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024

Explanatory memorandum to a draftReleased with the notice dated 27 Aug 2024

Draft

The draft has since been finalised as the Demand Flexibility and Demand Side Management Regulations, 2024.

Explanatory memorandum to the Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's explanatory memorandum for its draft Demand Flexibility and Demand Side Management Regulations, 2024, issued in August 2024 alongside the draft through the public commenting process (p1–2).

Section 1 sets out the background. MERC's two first-generation DSM regulations — the Implementation Framework and the Cost Effectiveness Assessment Tests — were notified in the Gazette of Maharashtra in April 2010 after public comments, and Maharashtra was the first state to issue such regulations. The Commission ties the new draft to its renewable-energy push and to the central Panchamrit targets of 500 GW of renewables and half of electricity consumed from renewables around 2030 (p2).

Section 2 reviews what the 2010 framework produced: discom-designed programmes in lighting, air-conditioning, appliance replacement, energy audits, thermal storage and demand response, with reported savings and a smaller demonstrated demand-response capability (p3).

Section 3 gives the rationale. With variable renewable generation and heavy solarisation of agriculture feeders and households, load must follow generation as well as generation follow load. MERC proposes to replace the two 2010 regulations with one regulation in three parts — Part A implementation framework, Part B cost-effectiveness assessment tests, Part C evaluation, measurement and verification, the last being new (p4). It sketches a proposed demand flexibility portfolio obligation (DFPO) on distribution licensees, rising as a share of the previous year's reported peak demand over five years and held at the fifth-year level, or as the Commission varies, thereafter (p5). It also describes the proposed per-MW incentive and disincentive for over- and under-achievement and a proposed expert DF/DSM consultation committee to review discom portfolios and recommend to the Commission (p6).

Section 4 covers technology: EV charging as a headline flexible load, plus thermal energy storage, heat pumps, urban water pumping and lift irrigation, with the claim that a fifth or more of load may be flexible (p6). It notes that Part B carries over the 2010 cost-effectiveness tests unchanged but admits ancillary-services revenue into the benefit-cost stream, and that Part C introduces process, impact and market evaluations, with independent verification agencies and BEE-aligned certification (p6–7). The Commission invites comments before notification (p7).

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response, Ancillary services and reserves, Advisory committees

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.