MERC · Maharashtra Electricity Regulatory Commission
Draft Demand Flexibility and Demand Side Management Regulations, 2024 — Explanatory Memorandum
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION EXPLANATORY MEMORANDUM (EM) On DRAFT MERC (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024
Explanatory memorandum to a draftReleased with the notice dated 27 Aug 2024
Draft
The draft has since been finalised as the Demand Flexibility and Demand Side Management Regulations, 2024.
Explanatory memorandum to the Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's explanatory memorandum for its draft Demand Flexibility and Demand Side Management Regulations, 2024, issued in August 2024 alongside the draft through the public commenting process (p1–2).
Section 1 sets out the background. MERC's two first-generation DSM regulations — the Implementation Framework and the Cost Effectiveness Assessment Tests — were notified in the Gazette of Maharashtra in April 2010 after public comments, and Maharashtra was the first state to issue such regulations. The Commission ties the new draft to its renewable-energy push and to the central Panchamrit targets of 500 GW of renewables and half of electricity consumed from renewables around 2030 (p2).
Section 2 reviews what the 2010 framework produced: discom-designed programmes in lighting, air-conditioning, appliance replacement, energy audits, thermal storage and demand response, with reported savings and a smaller demonstrated demand-response capability (p3).
Section 3 gives the rationale. With variable renewable generation and heavy solarisation of agriculture feeders and households, load must follow generation as well as generation follow load. MERC proposes to replace the two 2010 regulations with one regulation in three parts — Part A implementation framework, Part B cost-effectiveness assessment tests, Part C evaluation, measurement and verification, the last being new (p4). It sketches a proposed demand flexibility portfolio obligation (DFPO) on distribution licensees, rising as a share of the previous year's reported peak demand over five years and held at the fifth-year level, or as the Commission varies, thereafter (p5). It also describes the proposed per-MW incentive and disincentive for over- and under-achievement and a proposed expert DF/DSM consultation committee to review discom portfolios and recommend to the Commission (p6).
Section 4 covers technology: EV charging as a headline flexible load, plus thermal energy storage, heat pumps, urban water pumping and lift irrigation, with the claim that a fifth or more of load may be flexible (p6). It notes that Part B carries over the 2010 cost-effectiveness tests unchanged but admits ancillary-services revenue into the benefit-cost stream, and that Part C introduces process, impact and market evaluations, with independent verification agencies and BEE-aligned certification (p6–7). The Commission invites comments before notification (p7).
Read with this
The regulation
- Dated 19 Nov 2024Demand Flexibility and Demand Side Management Regulations, 2024
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
- Dated 27 Aug 2024Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft
- Dated 27 Aug 2024Public notice: Public Notice — Comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
- Dated 25 Sep 2024Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.