Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Demand Flexibility and Demand Side Management Regulations, 2024

Maharashtra Electricity Regulatory Commission (Demand Flexibility and Demand Side Management – Implementation Framework, Costeffectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024

RegulationDated 19 Nov 2024No. MERC /Tech/Regulations/2024 /702 dated 19 November 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MERC's Demand Flexibility and Demand Side Management Regulations, 2024 (notification No. MERC /Tech/Regulations/2024 /702, dated 19 November 2024) set out how every existing and prospective distribution licensee in Maharashtra must plan, fund, screen and verify demand flexibility (DF) and demand side management (DSM) activity. They take effect on publication in the Official Gazette, but no Gazette date is printed (p39). The instrument is expressly built as three components: Part A implementation framework (Regs 3–6), Part B cost-effectiveness assessment (Regs 7–11) and Part C evaluation, measurement and verification (Regs 12–17) (p39).

Part A makes DF/DSM part of day-to-day licensee operations, requires a staffed DF/DSM Cell, prescribes rolling five-year and one-year portfolio structures built on load research, and routes all justifiable DF/DSM costs into MYT filings and the ARR. It creates a DF/DSM Consultation Committee convened by the Secretary MERC, sets a Demand Flexibility Portfolio Obligation that steps up over a five-year trajectory from FY2025-26 and thereafter continues at the final level until revised, fixes the portfolio submission calendar relative to MYT filings, provides an incentive/disincentive per MW of over- or under-achievement, lists eligible programme and sector baskets, and requires public disclosure of portfolio documents and EM&V reports (pp43–47).

Part B gives the screening decision tree — TRC as the main hurdle test, then RIM, with a lifecycle revenue impact cap on tariff increase — plus the cost and benefit elements for each test and the default input values (avoided purchase cost, escalation, discount rates) that all licensees must use (pp49–52). Part C covers impact, process and market-effects evaluation; three savings-estimation approaches (IPMVP-based measurement and verification, deemed savings, large-scale data analysis); net-to-gross adjustments; empanelment and independence of Independent Verification Agencies; and the minimum contents of EM&V reports (pp53–56). Regulations 18–20 give the Commission powers to remove difficulties, issue orders and practice directions, and amend (p56). Annexure 1 prescribes the portfolio and programme document formats, Annexure 2 the PCT and SCT methods, Annexure 3 the IPMVP options (pp57–63).

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response, Advisory committees, Energy storage deployment

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document