MERC · Maharashtra Electricity Regulatory Commission

Demand Flexibility and Demand Side Management Regulations, 2024 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DEMAND FLEXIBILITY AND DEMAND SIDE MANAGEMENT – IMPLEMENTATION FRAMEWORK, COST-EFFECTIVENESS ASSESSMENT; AND EVALUATION, MEASUREMENT AND VERIFICATION) REGULATIONS, 2024

Statement of reasonsDated 19 Nov 2024

The commission's reasons for the Demand Flexibility and Demand Side Management Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SOR) that the Maharashtra Electricity Regulatory Commission issued with the MERC (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024, dated 19 November 2024 (p1). It records the consultation on the draft Regulations published on the Commission's website on 27 August 2024, with comments invited by 20 September 2024 and, on a stakeholder's request, extended to 30 September 2024 (p1–2). Seven stakeholders responded – listed in Annexure I (p15) – and the SOR sets out their main points and the Commission's ruling clause by clause, following the chapter order of the draft.

Chapter 1 (pp3–4) covers definitions: the Commission declines to widen 'DF/Demand-Side Resource' to cover RE curtailment or to bar diesel sets, but introduces a definition of 'Aggregator' registered with a distribution licensee, and recasts the DF/Demand-Side Resource definition to cover a single or group of devices at one or multiple locations.

Chapter 2 (pp5–9) is the implementation framework: recovery of justifiable DF/DSM costs through MYT filings and the ARR; the DFPO multi-year trajectory, which the Commission reduces from the draft (revised to 1.5% of the previous year's peak demand in FY 2025-26, rising to 3.5% in FY 2029-30 and staying at 3.50% thereafter until revised) along with how a DFPO is to be demonstrated; the DF/DSM Consultation Committee; and funding, where a dedicated pilot pool and a DF/DSM Charge are declined or held in reserve.

Chapter 3 (pp10–11) sets the default inputs for the cost-effectiveness tests and the three evaluation types, and records the revision of the SCT avoided power purchase cost from Rs. 12/kWh to Rs. 10/kWh. Chapter 4 (pp12–13) covers EM&V: the savings equation and impact-evaluation approaches, process-evaluation content and instruments, and Independent Verification Agency empanelment criteria. Annexure II (p16) works a DFPO calculation through a licensee's consumer-category load data.

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response, Advisory committees

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.