Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SOR) that the Maharashtra Electricity Regulatory Commission issued with the MERC (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement and Verification) Regulations, 2024, dated 19 November 2024 (p1). It records the consultation on the draft Regulations published on the Commission's website on 27 August 2024, with comments invited by 20 September 2024 and, on a stakeholder's request, extended to 30 September 2024 (p1–2). Seven stakeholders responded – listed in Annexure I (p15) – and the SOR sets out their main points and the Commission's ruling clause by clause, following the chapter order of the draft.
Chapter 1 (pp3–4) covers definitions: the Commission declines to widen 'DF/Demand-Side Resource' to cover RE curtailment or to bar diesel sets, but introduces a definition of 'Aggregator' registered with a distribution licensee, and recasts the DF/Demand-Side Resource definition to cover a single or group of devices at one or multiple locations.
Chapter 2 (pp5–9) is the implementation framework: recovery of justifiable DF/DSM costs through MYT filings and the ARR; the DFPO multi-year trajectory, which the Commission reduces from the draft (revised to 1.5% of the previous year's peak demand in FY 2025-26, rising to 3.5% in FY 2029-30 and staying at 3.50% thereafter until revised) along with how a DFPO is to be demonstrated; the DF/DSM Consultation Committee; and funding, where a dedicated pilot pool and a DF/DSM Charge are declined or held in reserve.
Chapter 3 (pp10–11) sets the default inputs for the cost-effectiveness tests and the three evaluation types, and records the revision of the SCT avoided power purchase cost from Rs. 12/kWh to Rs. 10/kWh. Chapter 4 (pp12–13) covers EM&V: the savings equation and impact-evaluation approaches, process-evaluation content and instruments, and Independent Verification Agency empanelment criteria. Annexure II (p16) works a DFPO calculation through a licensee's consumer-category load data.
Read with this
The regulation
- Dated 19 Nov 2024Demand Flexibility and Demand Side Management Regulations, 2024
Procedures and orders made under it
Earlier drafts
- Dated 27 Aug 2024Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft
- Released with the notice dated 27 Aug 2024Explanatory memorandum: Draft Demand Flexibility and Demand Side Management Regulations, 2024 — Explanatory Memorandum
- Dated 27 Aug 2024Public notice: Public Notice — Comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
- Dated 25 Sep 2024Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.