Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Public Notice — Extension of time for filing comments on Draft Demand Flexibility and Demand Side Management Regulations, 2024

Extension of time for filing comments on Draft Regulations

Notice extending the date for comments on a draftDated 25 Sep 2024

Draft

The draft has since been finalised as the Demand Flexibility and Demand Side Management Regulations, 2024.

Notice extending the date for comments on the Demand Flexibility and Demand Side Management (Implementation, Cost-effectiveness and EM&V) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page public notice from the Maharashtra Electricity Regulatory Commission that does a single thing: it pushes back the deadline for public comments on a set of draft regulations (p1).

The notice recalls that, by a Public Notice dated 27 August 2024, the Commission had invited written comments, suggestions and objections on the Draft MERC (Demand Flexibility and Demand Side Management – Implementation Framework, Cost-effectiveness Assessment; and Evaluation, Measurement, and Verification) Regulations, 2024, with 20 September 2024 as the last date for submission (p1).

Acting on requests from stakeholders, the Commission extends that date up to 30 September 2024, and states that all future communication on the issue will be handled through the MERC website only (p1). It is signed by the I/c Secretary at Mumbai on 25 September 2024 (p1).

The notice sets no substantive obligation and gives no content of the draft regulations themselves; it matters only as the record of the operative comment deadline for that consultation.

Standard name
Demand Side Management and Demand Response

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document