Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Electricity Supply Code and Connected Matters, 2004 — Ninth Amendment, 2009

The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters)(Ninth Amendment) Regulations, 2009

AmendmentDated 19 Feb 2010No. RERC/Secy/Reg. 79 dated 19th Feb., 2010

Replaced by Electricity Supply Code and Connected Matters Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Ninth Amendment to the RERC (Electricity Supply Code and Connected Matters) Regulations, 2004, issued as Notification No. RERC/Secy/Reg. 79 from Jaipur on 19 February 2010 (p1). It rewrites selected clauses of the principal supply code rather than issuing a self-contained code. It states that it takes effect from the date of publication in the official gazette, but no gazette date is printed (p1).

Regulation 4 deals with the category of consumers and character of service. It covers cases where an existing connection is at variance with the category table, the licensee’s power to change the character of service after notice, transformer provision and recovery of transformer rent, and flexibility in contract demand for large industrial and other HT categories (p1).

Regulation 6 governs applications for supply. It provides for a form based on Annex-IV, electronic application forms, free supply/download of forms and checklists, and adds new sub-regulations on inspection deficiencies, multiple connections in the same premises, licensee-provided transformers, HT consumer agreements on non-judicial stamp paper, when the application itself becomes the agreement, restrictions on assignment, arrears on change of ownership, shifting of connections, rural HT supply through continuous supply feeders, temporary supply exclusions, and construction-period supply (p1–3).

Regulation 11 covers supply where the electric line or plant is provided by the applicant. It addresses maintenance and vesting of service lines, the licensee’s right to use the service line and lay feeders, protection of dedicated feeders from tapping, supervision charges for areas electrified by local bodies, railways, defence, private housing societies or developers, and the building complex/large building regime, including transformer installation, works to be done by the owner/developer, design margins and cases where no transformer space is available (p3–6).

Regulations 16, 20, 25, 30, 35, 43 and 44 deal with security exemptions, consumer-provided meters, ground-floor metering, defective-meter testing, bill delivery and payment periods and modes, deposits for long absence, increase/decrease of connected load or contract demand, and the licensee’s duty to issue detailed terms and conditions of supply (p6–7).

The Schedule amendments and new schedules set charges and fees for temporary connection line/plant charges, testing fees, testing of consumer installations, re-sealing, replacement of broken glass, attendance of fuse men, change of meter, shifting of meters and service lines, and duplicate bills (p7–9). The appended model HT/EHT agreement (pp15–16) and checklist (p17) support the agreement requirements.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document