RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters, 2004 — Eighth Amendment, 2007
The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters - Eighth Amendment) Regulations, 2004
AmendmentDated 15 Oct 2007No. RERC/Secy/Reg.71 dated 15th October, 2007
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Eighth Amendment to the RERC (Electricity Supply Code and Connected Matters) Regulations, 2004, notified by the Rajasthan Electricity Regulatory Commission on 15 October 2007 under sections 43 to 48, 50, 55 and 56 read with section 181 of the Electricity Act 2003 (p1). It takes effect from publication in the official gazette; the gazette date is not printed (p1). Unusually, it does not merely list changes: for each amended clause it sets out the full amended wording, so it reads as a working version of the supply code's consumer-facing provisions.
Pages 1–3 deal with the connection process. They cover how security is taken from LT versus HT applicants (cl 6(3)); how incomplete applications are handled, with a defect notice, cancellation, forfeiture of the application fee and refund with bank-rate interest (cl 6(6)); a category- and locality-wise priority register with first-come-first-serve release of connections (cl 12); refunds when an applicant withdraws or refuses supply (cl 13); recovery of minimum charges from applicants who delay taking supply (cl 14); security for large industrial consumers on special fortnightly billing (cl 16(1)); review of security against actual first-year consumption (cl 16(2)(a)); and refund of excess security and interest on deposits (cll 19–21). A replaced clause 6(A) routes agriculture consumer matters — application, priority, load increase, shifting, restoration — to State Government policy directions under section 108, while barring the licensee from revising application fee, line cost or rental charges except through Commission regulations (p2).
Pages 4–7 cover metering, dues and enforcement: assessment for temporary connections (cl 29(1)(iv)); testing of defective meters at Commission-designated laboratories (cl 30(1)) and the timetable for intimating assessment and adjusting it in later bills (cl 30(2)); a two-year limitation on recovery of old dues (cl 39(1)); a time-limited scheme for waiver or reduction of interest/LPS/DPS (cl 39(3)); restoration of supply procedure (cl 40); and a rewritten theft/unauthorized-use regime under cl 41(A) — period of assessment, assessment at twice the applicable tariff, the provisional assessment order and notice, the deposit precondition for appeal, who may disconnect, complaints to the Special Court or police, compounding, restoration within 48 hours and debarment on repeat conviction (pp4–7).
Page 8 deletes a set of clauses, notes and provisos from the principal regulations and revises the Schedule's application deposits and LT extension charges; page 9 gives the standard line-cost schedule for HT/EHV lines and substation bays and renames 'minimum charges'/'minimum billing' as 'fixed charges' following the Commission's 31 August 2007 retail tariff rationalisation order (pp8–9).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 2 Sep 2006Electricity Supply Code and Connected Matters Regulations, 2004 — Fifth Amendment Regulations, 2006
- Dated 2 Mar 2007Electricity Supply Code and Connected Matters (Seventh Amendment) Regulations, 2004
- Dated 19 Feb 2010Electricity Supply Code and Connected Matters, 2004 — Ninth Amendment, 2009
- Dated 9 Aug 2017Electricity Supply Code and Connected Matters Regulations, 2004 — Eleventh Amendment, 2017
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.