RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters Regulations, 2004 — Fifth Amendment Regulations, 2006
The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Fifth Amendment) Regulations, 2006.
AmendmentDated 2 Sep 2006No. RERC/Secy/Reg.54 dated 2 .9. 2006
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's Fifth Amendment to the Electricity Supply Code and Connected Matters Regulations, 2004, issued as No. RERC/Secy/Reg.54 and dated 2.9.2006 (p1). It is the vehicle for folding the State Government's Revised Agriculture Policy into the Supply Code, following directives of 18.9.2004 and later amendments up to 23.1.2006 (p1, p11). The regulation itself is to come into force from publication in the official gazette, though the gazette date is not printed (p1).
Clause 2 rewrites the agriculture-connection provisions of the 2004 Code. Amendments 1–2 add application-money, demand-note, connected-load and L-form requirements to Clauses 6[2] and 6[7] (pp1–2). Amendment 3 replaces Clause 6A with technical feasibility and works-estimate rules for agricultural connections—transformer loading, direct feeder, LT-line length, pole provision and metering (p2). Amendment 4 adds priority rules for general, special, farm-house and co-operative/lift-irrigation categories, including subdivision-wise priority and re-determination after demand-note payment (pp2–4). Amendment 5 replaces the old unmetered-supply cut-off in Clause 25[1] with conversion to metered supply within a period notified by the Commission under s.55(1) (p4). Amendment 6 replaces Clause 40 restoration-of-supply periods and charges, with separate treatment for agriculture, industrial and other consumers (pp4–5). Amendment 7 inserts Clause 40(A) to convert special, nursery, farm-house and Hara Chara connections to general category, including a retrospective conversion date of 19.11.2005 for older connections (pp5–6). Amendment 8 inserts theft provisions for agriculture in Clause 41(A) (p6). Amendment 9 inserts Clause 43(3) on inspection, excess load, load extension and second connections (pp7–8). Amendments 10–12 replace schedule entries for application fees, amounts deposited with applications and additional amounts for agricultural connections (pp8–9).
The amendments are retrospective: they take effect from 18.9.2004, except specified clauses with dates ranging from 2.12.2004 to 16.12.2005 (p10). An explanatory note at p11 records the Advocate General's advice and the policy paragraphs left out of the amendment.
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 2 Mar 2007Electricity Supply Code and Connected Matters (Seventh Amendment) Regulations, 2004
- Dated 15 Oct 2007Electricity Supply Code and Connected Matters, 2004 — Eighth Amendment, 2007
- Dated 19 Feb 2010Electricity Supply Code and Connected Matters, 2004 — Ninth Amendment, 2009
- Dated 9 Aug 2017Electricity Supply Code and Connected Matters Regulations, 2004 — Eleventh Amendment, 2017
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.