Electricity Supply Code and Connected Matters Regulations, 2004 — Eleventh Amendment, 2017

Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Eleventh Amendment) Regulations, 2017

AmendmentDated 9 Aug 2017No. RERC/Secy/ Reg. 120 dated 9th August, 2017

Replaced by Electricity Supply Code and Connected Matters Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Eleventh Amendment to the RERC (Electricity Supply Code and Connected Matters) Regulations, 2004, notified by the Rajasthan Electricity Regulatory Commission at Jaipur on 9 August 2017 and effective from the date of Gazette publication, which is not printed (p1). Rather than issuing a standalone code it rewrites, in place, roughly thirty provisions of the principal Supply Code.

Clauses 2–3 refresh definitions — Authorized Officer, Installation Certificate, Schedule, Standard/Store Issue Rate and Temporary supply — and defer permissible frequency and voltage variation to CEA and Commission regulations (p1). Clause 4 reworks the notes under the voltage/load-category table: what happens when an existing connection is at variance, when a consumer sits in a higher load category without applying for change, supply at one voltage stage higher or lower, and single-phase release in scattered areas (p2). Clauses 5–6 govern point of supply and the connection process — application forms, fees, deficiency handling and deemed sanction, inspection, HT agreements, temporary supply, shifting and transfer of connections (pp2–5). Clauses 7–9 deal with feeder tapping and cost-sharing for scattered areas, private developer colonies, private industrial areas and RIICO industrial areas, with clause 10 giving force majeure relief from the service timelines (pp5–8).

The middle block (clauses 11–19) covers security deposits, exemption and transfer of security, interest on security, metering and seals, meter reading, and assessment for stopped, defective, inaccurate, lost or stolen meters (pp8–11). Clauses 20–26 set bill contents, modes of payment, disconnection and restoration of supply, recovery of arrears and charges for unauthorized use (pp12–17). Clauses 27–30 adjust load-change notice, supervision-charge wording and amend the Schedule of fees, rentals and charges (pp17–19), and clause 31 replaces the model power supply agreement with Appendix-I (pp20–22).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document