RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters Regulations, 2004 — Eleventh Amendment, 2017
Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Eleventh Amendment) Regulations, 2017
AmendmentDated 9 Aug 2017No. RERC/Secy/ Reg. 120 dated 9th August, 2017
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Eleventh Amendment to the RERC (Electricity Supply Code and Connected Matters) Regulations, 2004, notified by the Rajasthan Electricity Regulatory Commission at Jaipur on 9 August 2017 and effective from the date of Gazette publication, which is not printed (p1). Rather than issuing a standalone code it rewrites, in place, roughly thirty provisions of the principal Supply Code.
Clauses 2–3 refresh definitions — Authorized Officer, Installation Certificate, Schedule, Standard/Store Issue Rate and Temporary supply — and defer permissible frequency and voltage variation to CEA and Commission regulations (p1). Clause 4 reworks the notes under the voltage/load-category table: what happens when an existing connection is at variance, when a consumer sits in a higher load category without applying for change, supply at one voltage stage higher or lower, and single-phase release in scattered areas (p2). Clauses 5–6 govern point of supply and the connection process — application forms, fees, deficiency handling and deemed sanction, inspection, HT agreements, temporary supply, shifting and transfer of connections (pp2–5). Clauses 7–9 deal with feeder tapping and cost-sharing for scattered areas, private developer colonies, private industrial areas and RIICO industrial areas, with clause 10 giving force majeure relief from the service timelines (pp5–8).
The middle block (clauses 11–19) covers security deposits, exemption and transfer of security, interest on security, metering and seals, meter reading, and assessment for stopped, defective, inaccurate, lost or stolen meters (pp8–11). Clauses 20–26 set bill contents, modes of payment, disconnection and restoration of supply, recovery of arrears and charges for unauthorized use (pp12–17). Clauses 27–30 adjust load-change notice, supervision-charge wording and amend the Schedule of fees, rentals and charges (pp17–19), and clause 31 replaces the model power supply agreement with Appendix-I (pp20–22).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 2 Sep 2006Electricity Supply Code and Connected Matters Regulations, 2004 — Fifth Amendment Regulations, 2006
- Dated 2 Mar 2007Electricity Supply Code and Connected Matters (Seventh Amendment) Regulations, 2004
- Dated 15 Oct 2007Electricity Supply Code and Connected Matters, 2004 — Eighth Amendment, 2007
- Dated 19 Feb 2010Electricity Supply Code and Connected Matters, 2004 — Ninth Amendment, 2009
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.