Deviation Settlement Mechanism and related matters Regulations, 2019

MaharashtraElectricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2019

RegulationDated 1 Mar 2019MERC/Admin/Regulation /2019/0142 dated 1st March, 2019

Replaced by Deviation Settlement Mechanism and related matters Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken, including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations, shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2019 — notification No. MERC/Admin/Regulation/2019/0142 — create the state-level commercial framework for deviation settlement among grid users in Maharashtra. They are made under Sections 32(3), 33(4), 66, 86(1)(b) and (h) and 181(1)(g) and (zp) of the Electricity Act, 2003 (p21). Regulation 3 (p23) states the objective: maintaining grid discipline and grid security through a commercial mechanism for deviation settlement of drawal and injection.

Commencement is staged. Regulation 1(2) brings the Regulations into force on the date of notification in the Official Gazette — a date the document does not print. The commercial arrangements in Clauses (9) and (10) — Deviation Charges, Additional Charges for Deviation and penal action — commence from a date to be notified by separate Order, not later than 1 April 2020, and until then the Final Balancing and Settlement Mechanism approved under the Commission's Order in Case 42 of 2006 continues for energy accounting and deviation settlement (p21).

Regulation 4 (p23) fixes coverage: Sellers with installed generating capacity above 25 MW, including renewable generators but excluding wind and solar (left to the 2018 Forecasting, Scheduling and Deviation Settlement Regulations), plus open access and captive generators (excluding in-situ captive) on the intra-state transmission system; and Buyers including distribution licensees, deemed distribution licensees and full open access consumers on InSTS. Partial open access consumers and all open access consumers on the distribution network are left to the 2016 Open Access Regulations. The threshold is revisable in stages by separate notification.

Regulation 5 (pp23–24) sets participation duties — contract disclosure to SLDC, compliance with the IEGC and State Grid Code, connection/open access agreements, 15-minute metering with GPS time synchronisation, and binding SLDC despatch instructions with published pool information. Regulation 6 (pp24–25) then specifies the mechanism's design parameters: a scheduling period of 96 15-minute blocks; merit-order-despatch guiding principles for scheduling and despatch; the frequency operating range tied to the Grid Codes; weekly settlement of the State Deviation Pool Account; kWh/INR measurement units with rounding; adoption of the CERC 2014 deviation price vector; deviation volume limits enforced through Regulation 10 additional charges; and loss allocation in proportion to scheduled drawal with SLDC reconciliation. Regulation 7 (p25) leaves declaration of capacity and scheduling to the State Grid Code and the Open Access Regulations and requires SLDC to publish provisional weekly/monthly State Energy and State Deviation Pool Accounts that become final and binding after scrutiny.

The appended charge provisions and tables (pp34–38) specify the price vector — charges for deviation as a function of average time-block frequency, with a dynamic slope anchored to the daily area clearing price and a ceiling — the cap rate for generating stations whose tariff is determined by the Commission and for others, differential 95%/105% rates for inter-state open access transactions of state entities, additional deviation charge adders in slabs of schedule deviation (separately for over-drawal and under-injection), a capped structure for under-injection by coal/lignite/APM-gas stations, and a worked illustration. Regulations 18–21 and the Maharashtra State Power Committee's duties (p33) close the instrument: Commission powers to amend, remove difficulties, relax and issue directions, and MSPC's coordination, compliance-reporting and advisory role. The document is signed by the Secretary, MERC, at Mumbai on 1 March 2019 (p33).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.