Removal of Difficulty in implementation of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
Removal of Difficulty in the process of implementation of MERC (Deviation Settlement Mechanism and related matters) Regulations, 2019
OrderDated 6 May 2021
Replaced by Deviation Settlement Mechanism and related matters Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Deviation Settlement Mechanism and related matters Regulations, 2019.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken, including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations, shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 27 of 32. Check the regulator's original before you rely on it.
This is a MERC Order dated 6 May 2021 that removes implementation difficulties in the MERC (Deviation Settlement Mechanism and related matters) Regulations, 2019 (DSM Regulations), issued under Regulation 19 (removal of difficulty) and Regulation 20 (power to relax) of those Regulations (p1, p7).
The first six pages are the record: the DSM Regulations were notified on 1 March 2019 but commercial implementation was repeatedly deferred (Orders of 28 March, 5 June and 28 October 2020), a Working Group was constituted on 7 January 2019 to monitor readiness, MSLDC reported software module problems, three petitions (Case Nos. 110, 114 and 58 of 2020) were decided, and an ATE Daily Order of 23 December 2020 stayed implementation pending Appeal No. 5 of 2021. These pages also summarise the Working Group's preparedness report — IEM/AMR installation progress, core and non-core DSM software modules, trial-run bill analysis and stakeholder concerns (p2–6).
Pages 7–21 work through six clarificatory issues, each with the Working Group's recommendation and the Commission's ruling: (1) the ADSM rate for over-drawal and under-injection below 49.85 Hz, aligned to the amended CERC DSM framework and fixed at 100% of the 800.00 Paise/kWh DSM charge for buyers and 100% of the Cap Rate for sellers, with a deemed-application mechanism if CERC later changes its percentage (p7–9); (2) reading the frequency trigger in Regulation 10(F) as 50.10 Hz and above instead of 50.05 Hz, to match the CERC price vector (p9–11); (3) merit-order treatment of gas-based units running on RLNG versus APM gas (p11–13); (4) treatment of negative injection/station auxiliary drawal during zero schedule or reserve shutdown, with netting-off allowed only for stations in the same distribution licensee's area with a Section 62 PPA (p13–15); (5) a revised accounting treatment for standby power supplied by MSEDCL to Mumbai distribution licensees, including the first three time-blocks and proportionate sharing of deviation charges (p15–19); and (6) recognition of grid disturbance as a force majeure event under the Grid Code Regulations so deviations are treated as zero, with MSLDC to declare and post notice (p19–21).
Pages 21–27 take up the seventh and largest issue: approval of volume limits for State Entities for FY 2021-22 and a transition arrangement. MSLDC's NCPD-based volume-limit computation is tabulated (p22), the Working Group's four stabilisation options are compared (p23–25), and the Commission directs a relaxed volume limit during the mock trial run and Stabilisation Period — an incremental allowance for sellers and buyers (with a distinct approach for deemed licensees with peak demand up to 100 MW) (p26). Stage-1 extends the mock trial run in three parts: Part-A to 16 May 2021 under existing limits, Part-B requiring MSLDC to revise procedures and software within 10 days, and Part-C the extended run from 17 May to 15 August 2021 under relaxed limits (p26–27). Stage-2, the Stabilisation Period marking commercial commencement, is left to a separate Order conditional on the ATE outcome, with a first-instance duration of six months and gradual withdrawal of relaxations on quarterly review (p27).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 28 Mar 2020Commercial Arrangement under DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 5 Jun 2020DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 28 Oct 2020DSM Regulations, 2019 — Removal of Difficulty Order on Commencement of Commercial Arrangement, 2020
- Dated 7 Oct 2021Commencement of Commercial Arrangement of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.