MERC · Maharashtra Electricity Regulatory Commission
Deviation Settlement Mechanism & related matters Regulations, 2019 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism & related matters) Regulations, 2019
Statement of reasonsDated 1 Mar 2019
Replaced by Deviation Settlement Mechanism and related matters Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Deviation Settlement Mechanism and related matters Regulations, 2019.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken, including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations, shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 23 of 50. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for the MERC (Deviation Settlement Mechanism & related matters) Regulations, 2019, dated 1 March 2019. It explains why Maharashtra moved from the WASMP-based balancing and settlement mechanism introduced by the suo-motu order of 17 May 2007 to an intra-state Deviation Settlement Mechanism (p1). It records the consultation: the draft 2018 regulations and explanatory memorandum, newspaper notices in Marathi and English, comments due 23 November 2018 with six respondents, and a stakeholder workshop on 12 February 2019 held after CERC notified the 4th Amendment to its DSM Regulations on 20 November 2018 (p1).
The document runs issue by issue, each with the draft provision, comments received, the Commission's analysis and decision, and the resulting provision. Issue 1 covers commencement: the regulations take effect on gazette notification, but the commercial arrangement is phased, targeted by 1 April 2020 to align with the 4th MYT Control Period, with a separate order to fix the commercial start after a review of preparedness (p2–3). Issue 2 revises definitions — Gaming now extends to buyers and Time Block follows the CERC 4th Amendment — and Issue 3 brings CERC's market-linked design concepts, notably Area Clearing Price and Day Ahead Market Price, into the state price vector (p3–7).
Issue 4 sets applicability: sellers above 25 MW installed capacity connected to the intra-state transmission system, including renewable generators other than wind and solar, with buyers including deemed distribution licensees; partial open access consumers stay under the Open Access Regulations (p8–11). Issue 5 covers the duties of SLDC and state entities and directs the STU to prepare a metering action plan within a month and achieve 100% interface metering within six months of notification (p11–14). Issue 6, the longest, sets the guiding principles for scheduling and despatch — utility-wise decentralised merit order despatch day-ahead with centralised despatch in real time, inter-se exchange of un-requisitioned surplus at licensees' discretion, treatment of hydro and schedules revised from the fourth time block — and directs SLDC to draft the scheduling and accounting procedures for consultation (p15–21). Issues 7 to 9 cover SCADA visibility responsibility, the weekly settlement cycle for the State Deviation Pool Account, and allocation of intra-state transmission losses in scheduling (p21–23).
Throughout, matters are pushed to other processes: technical minimum and state grid code revision to the merit order despatch guidelines, reserve and ancillary services to separate regulations, and open access tariff and temporary tariff issues outside the DSM proceeding.
Read with this
The regulation
Procedures and orders made under it
- Dated 28 Mar 2020Commercial Arrangement under DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 5 Jun 2020DSM Regulations, 2019 — Removal of Difficulty Order, 2020
- Dated 28 Oct 2020DSM Regulations, 2019 — Removal of Difficulty Order on Commencement of Commercial Arrangement, 2020
- Dated 6 May 2021Removal of Difficulty in implementation of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
- Dated 7 Oct 2021Commencement of Commercial Arrangement of Deviation Settlement Mechanism Regulations, 2019 — Order, 2021
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.