MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2017
Draft amendmentReleased with the notice dated 26 Oct 2017No. MERC/Legal/2017/____ dated ___ October 2017
Draft
A proposal that has since been finalised as the Multi Year Tariff Regulations, 2015 — First Amendment, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification proposing the First Amendment to the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2015. It re-casts the O&M expense provisions of the parent regulation, moving the base year to FY 2015-16 and rewiring how O&M is escalated across the Control Period (p1–4).
Clause 2 swaps the definition of 'Base Rate' so that it tracks the State Bank of India's one-year MCLR (p1). Clauses 3 and 4 replace Regulation 45.1 and 47.1 — O&M for generating stations and for existing hydro stations respectively — anchoring base-year O&M on the final trued-up FY 2015-16 figures after sharing of efficiency gains or losses and prudence check by the Commission, then escalating by a WPI/CPI-IW blend reduced by an efficiency factor, with a parallel proviso for truing-up (p1–2). Clause 5 does the same for new hydro stations, starting from a first-year O&M derived from original project cost (p2).
Clauses 6 and 7 apply the identical architecture to the distribution wires business and the retail supply business of distribution licensees, each with its own WPI/CPI weighting and a case-by-case route for deemed licensees whose tariff has not yet been determined (p3–4). Clause 8 replaces the MSLDC provisions on the same pattern (p4). A closing note records that the principal Regulations were gazetted on 8 December 2015 (p4).
Read with this
The regulation
- Dated 8 Dec 2015Multi Year Tariff Regulations, 2015
Amendments and corrections
- Dated 29 Nov 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017
Commencement notices and reasons
Procedures and orders made under it
- Dated 5 Jan 2016Extension of Time for Filing of Multi Year Tariff Petition by MSETCL under MYT Regulations, 2015 — 2016
- Dated 15 Jan 2016MYT Petition Filing Extension Order, 15 January 2016
- Dated 30 Nov 2017Extension of time for filing of Mid Term Review Petition under the Multi Year Tariff Regulations, 2015 — 30 November 2017
- Dated 26 Dec 2017Extension of time for filing Mid Term Review Petition by Tata Power Generation and Distribution Business, 2017
Proposed changes (drafts with no final yet)
- Dated 9 Sep 2015Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
Earlier drafts
- Released with the notice dated 9 Sep 2015Multi Year Tariff Regulations, 2015 — Draft
- Dated 26 Oct 2017Public notice: Multi Year Tariff Regulations, 2015 — Proposed Amendment, 2017 — Public Notice
- Dated 26 Oct 2017Explanatory memorandum: Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.