Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2015 — Draft

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2015

Draft regulationReleased with the notice dated 9 Sep 2015

Draft

A proposal that has since been finalised as the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission’s principal multi-year tariff regulation for the 2016–20 Control Period. It extends to Maharashtra and applies to existing and future Generation Entities, Transmission Licensees, Distribution Licensees and the Maharashtra State Load Despatch Centre (MSLDC) for determination of Aggregate Revenue Requirement, Tariff and MSLDC Fees and Charges from 1 April 2016 to 31 March 2020 (p6). It supersedes the MERC (Multi Year Tariff) Regulations, 2011, while preserving the 2005/2011 regimes for matters up to 31 March 2016 (p6).

Regulations 1–3 set commencement, definitions and scope, including generation other than renewables, intra-State transmission, intervening transmission facilities, wheeling, retail supply, MSLDC fees, cross-subsidy surcharge and additional surcharge, and adoption of Section 63 bid-discovered tariffs (pp6–22).

Part A establishes the four-year MYT framework: a multi-year petition and forecast, tariff determination at the start of the Control Period, mid-term review and true-up, classification of controllable and uncontrollable factors, pass-through of fuel and other uncontrollable costs through the Z-factor Charge, and sharing of gains and losses (pp22–33). Part B lays down filing, public notice, the 120-day tariff order process, publication and adherence to tariff orders, including refund of excess recovery (pp33–38).

Part C governs power procurement by Distribution Licensees: a ten-year procurement plan aligned with the transmission plan, approval of power purchase agreements and arrangements, and rules for additional and short-term procurement (pp38–43). Part D sets common financial principles covering prudence, capital cost and additional capitalisation, consumer contributions and grants, debt-equity, depreciation, return on equity, interest, working capital, carrying cost, income tax, contingency reserves, rebates and delayed payment (pp44–65).

Part E specifies generation tariffs for conventional generation and hydro stations above 25 MW, covering existing, new and own stations, tariff components, renovation and modernisation, infirm power, non-tariff income, thermal and hydro operating norms, O&M expenses, computation and payment of fixed and energy charges, pumped storage, declared-capacity testing and billing (pp65–90). The norms include target availability, heat rates, secondary fuel oil, auxiliary consumption and transit losses, with station-specific and licensee-specific values for named generators.

Part F deals with intra-State transmission tariff: access charges, provisional tariff for new licensees, capital investment plans, availability targets and incentives, O&M norms by licensee, non-tariff income, income from other business, pooled transmission cost, base transmission capacity rights, sharing among users, billing and transmission losses (pp90–104).

Part G requires separation of Distribution Wires and Retail Supply accounts and supplies an allocation matrix where separation is incomplete; it then sets wheeling ARR, capital plans, O&M norms, bad-debt provision, non-tariff income, other-business income and wheeling losses (pp105–112). Part H sets the retail supply ARR, sales forecast, capital plan, O&M norms, bad debts, non-tariff income, other-business income, treatment of cross-subsidy and additional surcharge receipts, distribution-loss grossing and retail tariff principles (pp112–120).

Part I covers MSLDC capital investment, the LDC Development Fund, annual fixed charges, O&M, RLDC and WRPC costs, non-tariff income, sharing of MSLDC charges and fees (pp120–125). Part J prescribes how State Government subsidy is paid and passed through in consumer bills (p126). Part K gives powers to issue practice directions, amend the regulations and remove difficulties (pp126–127). Annexure I contains the depreciation schedule; Annexure II sets out the procedure, SIL table and formulae for computing transmission system availability (pp128–136).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Proposed changes (drafts with no final yet)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document