MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015 — Draft
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2015
Draft regulationReleased with the notice dated 9 Sep 2015
Draft
A proposal that has since been finalised as the Multi Year Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission’s principal multi-year tariff regulation for the 2016–20 Control Period. It extends to Maharashtra and applies to existing and future Generation Entities, Transmission Licensees, Distribution Licensees and the Maharashtra State Load Despatch Centre (MSLDC) for determination of Aggregate Revenue Requirement, Tariff and MSLDC Fees and Charges from 1 April 2016 to 31 March 2020 (p6). It supersedes the MERC (Multi Year Tariff) Regulations, 2011, while preserving the 2005/2011 regimes for matters up to 31 March 2016 (p6).
Regulations 1–3 set commencement, definitions and scope, including generation other than renewables, intra-State transmission, intervening transmission facilities, wheeling, retail supply, MSLDC fees, cross-subsidy surcharge and additional surcharge, and adoption of Section 63 bid-discovered tariffs (pp6–22).
Part A establishes the four-year MYT framework: a multi-year petition and forecast, tariff determination at the start of the Control Period, mid-term review and true-up, classification of controllable and uncontrollable factors, pass-through of fuel and other uncontrollable costs through the Z-factor Charge, and sharing of gains and losses (pp22–33). Part B lays down filing, public notice, the 120-day tariff order process, publication and adherence to tariff orders, including refund of excess recovery (pp33–38).
Part C governs power procurement by Distribution Licensees: a ten-year procurement plan aligned with the transmission plan, approval of power purchase agreements and arrangements, and rules for additional and short-term procurement (pp38–43). Part D sets common financial principles covering prudence, capital cost and additional capitalisation, consumer contributions and grants, debt-equity, depreciation, return on equity, interest, working capital, carrying cost, income tax, contingency reserves, rebates and delayed payment (pp44–65).
Part E specifies generation tariffs for conventional generation and hydro stations above 25 MW, covering existing, new and own stations, tariff components, renovation and modernisation, infirm power, non-tariff income, thermal and hydro operating norms, O&M expenses, computation and payment of fixed and energy charges, pumped storage, declared-capacity testing and billing (pp65–90). The norms include target availability, heat rates, secondary fuel oil, auxiliary consumption and transit losses, with station-specific and licensee-specific values for named generators.
Part F deals with intra-State transmission tariff: access charges, provisional tariff for new licensees, capital investment plans, availability targets and incentives, O&M norms by licensee, non-tariff income, income from other business, pooled transmission cost, base transmission capacity rights, sharing among users, billing and transmission losses (pp90–104).
Part G requires separation of Distribution Wires and Retail Supply accounts and supplies an allocation matrix where separation is incomplete; it then sets wheeling ARR, capital plans, O&M norms, bad-debt provision, non-tariff income, other-business income and wheeling losses (pp105–112). Part H sets the retail supply ARR, sales forecast, capital plan, O&M norms, bad debts, non-tariff income, other-business income, treatment of cross-subsidy and additional surcharge receipts, distribution-loss grossing and retail tariff principles (pp112–120).
Part I covers MSLDC capital investment, the LDC Development Fund, annual fixed charges, O&M, RLDC and WRPC costs, non-tariff income, sharing of MSLDC charges and fees (pp120–125). Part J prescribes how State Government subsidy is paid and passed through in consumer bills (p126). Part K gives powers to issue practice directions, amend the regulations and remove difficulties (pp126–127). Annexure I contains the depreciation schedule; Annexure II sets out the procedure, SIL table and formulae for computing transmission system availability (pp128–136).
Read with this
The regulation
- Dated 8 Dec 2015Multi Year Tariff Regulations, 2015
Amendments and corrections
- Dated 29 Nov 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017
Commencement notices and reasons
Procedures and orders made under it
- Dated 5 Jan 2016Extension of Time for Filing of Multi Year Tariff Petition by MSETCL under MYT Regulations, 2015 — 2016
- Dated 15 Jan 2016MYT Petition Filing Extension Order, 15 January 2016
- Dated 30 Nov 2017Extension of time for filing of Mid Term Review Petition under the Multi Year Tariff Regulations, 2015 — 30 November 2017
- Dated 26 Dec 2017Extension of time for filing Mid Term Review Petition by Tata Power Generation and Distribution Business, 2017
Proposed changes (drafts with no final yet)
- Dated 9 Sep 2015Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
Earlier drafts
- Released with the notice dated 26 Oct 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft
- Dated 26 Oct 2017Public notice: Multi Year Tariff Regulations, 2015 — Proposed Amendment, 2017 — Public Notice
- Dated 26 Oct 2017Explanatory memorandum: Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.