Draft MERC (Multi Year Tariff) (First Amendment) Regulations, 2017
Explanatory memorandum to a draftDated 26 Oct 2017
Draft
The draft has since been finalised as the Multi Year Tariff Regulations, 2015 — First Amendment, 2017.
Explanatory memorandum to the Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
An explanatory memorandum of the Maharashtra Electricity Regulatory Commission dated 26 October 2017, published for public comment alongside draft amendments to the MERC (Multi Year Tariff) Regulations, 2015 — the framework under which tariffs were determined for the third control period, FY 2016-17 to FY 2019-20 (p1). It is a statement of reasons, not an operative instrument: it explains why two sets of provisions need to change and lists the regulation numbers that would be amended (p11).
Parts 1 and 2 set the stage: the 2015 regulations replaced the 2011 regulations, MYT orders have already been issued for generation, transmission, distribution and the MSLDC, and utilities have since petitioned against the O&M norms — base-year computation, escalation rate and efficiency factor. The Commission commissioned a study from M/s Idam Infrastructure Advisory and decided to amend under section 181 of the Electricity Act read with Regulation 101 (p1–2).
Part 3A works through interest rates. The RBI moved fresh lending to the MCLR from 1 April 2016 while the 2015 regulations still key normative interest to the SBI Base Rate, which feeds interest on working capital, carrying/holding cost, security deposit interest and normative long-term loans. The Commission surveys MCLR revisions and actual utility lending rates, compares them with Base Rate plus spread, and proposes the one-year SBI MCLR as the Benchmark Rate, citing the CERC's 2017 renewable energy tariff regulations as precedent (p2–4).
Part 3B, the substantive core, reworks O&M. It identifies the anomaly of two FY 2015-16 O&M figures — the 2011-regulation true-up and the normalised Base Year — and proposes the final trued-up figure as the Base Year, to be settled at the Mid-Term Review. On escalation it analyses component-wise shares of employee, R&M and A&G costs for each utility to reset WPI/CPI weights, and proposes five-year averaging of the indices instead of one year. It declines to amend the efficiency factor, pointing to existing enabling provisions (p4–9).
Part 3C extends the same base-year and escalation treatment to generating stations commissioned before 26 August 2005 and all hydro stations, with its own weightings. Part 4 closes with the clause list: Regulation 2.1(10); 45.1, 47.1 and 47.2 for generation; 72 and 81 for distribution wires and retail supply; 93 for MSLDC (p9–11).
Read with this
The regulation
- Dated 8 Dec 2015Multi Year Tariff Regulations, 2015
Amendments and corrections
- Dated 29 Nov 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017
Commencement notices and reasons
Procedures and orders made under it
- Dated 5 Jan 2016Extension of Time for Filing of Multi Year Tariff Petition by MSETCL under MYT Regulations, 2015 — 2016
- Dated 15 Jan 2016MYT Petition Filing Extension Order, 15 January 2016
- Dated 30 Nov 2017Extension of time for filing of Mid Term Review Petition under the Multi Year Tariff Regulations, 2015 — 30 November 2017
- Dated 26 Dec 2017Extension of time for filing Mid Term Review Petition by Tata Power Generation and Distribution Business, 2017
Proposed changes (drafts with no final yet)
- Dated 9 Sep 2015Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
Earlier drafts
- Released with the notice dated 9 Sep 2015Multi Year Tariff Regulations, 2015 — Draft
- Released with the notice dated 26 Oct 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft
- Dated 26 Oct 2017Public notice: Multi Year Tariff Regulations, 2015 — Proposed Amendment, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.