Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Explanatory Memorandum — Draft

Draft MERC (Multi Year Tariff) (First Amendment) Regulations, 2017

Explanatory memorandum to a draftDated 26 Oct 2017

Draft

The draft has since been finalised as the Multi Year Tariff Regulations, 2015 — First Amendment, 2017.

Explanatory memorandum to the Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An explanatory memorandum of the Maharashtra Electricity Regulatory Commission dated 26 October 2017, published for public comment alongside draft amendments to the MERC (Multi Year Tariff) Regulations, 2015 — the framework under which tariffs were determined for the third control period, FY 2016-17 to FY 2019-20 (p1). It is a statement of reasons, not an operative instrument: it explains why two sets of provisions need to change and lists the regulation numbers that would be amended (p11).

Parts 1 and 2 set the stage: the 2015 regulations replaced the 2011 regulations, MYT orders have already been issued for generation, transmission, distribution and the MSLDC, and utilities have since petitioned against the O&M norms — base-year computation, escalation rate and efficiency factor. The Commission commissioned a study from M/s Idam Infrastructure Advisory and decided to amend under section 181 of the Electricity Act read with Regulation 101 (p1–2).

Part 3A works through interest rates. The RBI moved fresh lending to the MCLR from 1 April 2016 while the 2015 regulations still key normative interest to the SBI Base Rate, which feeds interest on working capital, carrying/holding cost, security deposit interest and normative long-term loans. The Commission surveys MCLR revisions and actual utility lending rates, compares them with Base Rate plus spread, and proposes the one-year SBI MCLR as the Benchmark Rate, citing the CERC's 2017 renewable energy tariff regulations as precedent (p2–4).

Part 3B, the substantive core, reworks O&M. It identifies the anomaly of two FY 2015-16 O&M figures — the 2011-regulation true-up and the normalised Base Year — and proposes the final trued-up figure as the Base Year, to be settled at the Mid-Term Review. On escalation it analyses component-wise shares of employee, R&M and A&G costs for each utility to reset WPI/CPI weights, and proposes five-year averaging of the indices instead of one year. It declines to amend the efficiency factor, pointing to existing enabling provisions (p4–9).

Part 3C extends the same base-year and escalation treatment to generating stations commissioned before 26 August 2005 and all hydro stations, with its own weightings. Part 4 closes with the clause list: Regulation 2.1(10); 45.1, 47.1 and 47.2 for generation; 72 and 81 for distribution wires and retail supply; 93 for MSLDC (p9–11).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Operating costs and other income, Return, financing and working capital

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Proposed changes (drafts with no final yet)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document