Multi Year Tariff Regulations, 2015 — First Amendment, 2017

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2017

AmendmentDated 29 Nov 2017No. MERC/Legal/2017/4792 dated 29th November 2017

Replaced by Multi Year Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An amendment to MERC's Multi Year Tariff Regulations, 2015, issued as Notification No. MERC/Legal/2017/4792 and signed by the Secretary on 29 November 2017 (p5, p8). It rewrites the operation and maintenance (O&M) cost-recovery methodology across generating stations, hydro stations, the distribution wires and retail supply businesses, and the State Load Despatch Centre, replacing the base-year and escalation provisions of the principal Regulations.

The first change redefines the "Base Rate" as the one-year MCLR declared by the State Bank of India (p5). The remaining amendments reset O&M expenses for the current control period onto a base year ending 31 March 2016 — final trued-up expenses, net of efficiency gain/loss sharing, excluding abnormal expenses and subject to prudence check — and then escalate that base by a weighted inflation factor combining WPI and CPI-IW, reduced by an efficiency factor, with a different WPI/CPI weightage for each business: generating stations (p5), existing and new hydro, the latter benchmarked to a percentage of original project cost (p6), distribution wires (p6–7), retail supply (p7) and MSLDC (p7–8). Truing-up uses the same weightages but includes the year of truing-up in the averaging window.

Two provisions let the Commission fix O&M on a case-to-case basis for a deemed distribution licensee whose tariff is yet to be determined (p7). Existing hydro stations may separately claim housing colony, medical and operating-staff costs (p6). The Regulations take effect from the date of publication in the Official Gazette, which is not printed (p5); a closing note records that the principal Regulations were gazetted on 8 December 2015 (p8).

Standard name
Multi Year Tariff Regulations
Primary topics
Operating costs and other income, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document