MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015 — First Amendment, 2017
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2017
AmendmentDated 29 Nov 2017No. MERC/Legal/2017/4792 dated 29th November 2017
Replaced by Multi Year Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Multi Year Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
An amendment to MERC's Multi Year Tariff Regulations, 2015, issued as Notification No. MERC/Legal/2017/4792 and signed by the Secretary on 29 November 2017 (p5, p8). It rewrites the operation and maintenance (O&M) cost-recovery methodology across generating stations, hydro stations, the distribution wires and retail supply businesses, and the State Load Despatch Centre, replacing the base-year and escalation provisions of the principal Regulations.
The first change redefines the "Base Rate" as the one-year MCLR declared by the State Bank of India (p5). The remaining amendments reset O&M expenses for the current control period onto a base year ending 31 March 2016 — final trued-up expenses, net of efficiency gain/loss sharing, excluding abnormal expenses and subject to prudence check — and then escalate that base by a weighted inflation factor combining WPI and CPI-IW, reduced by an efficiency factor, with a different WPI/CPI weightage for each business: generating stations (p5), existing and new hydro, the latter benchmarked to a percentage of original project cost (p6), distribution wires (p6–7), retail supply (p7) and MSLDC (p7–8). Truing-up uses the same weightages but includes the year of truing-up in the averaging window.
Two provisions let the Commission fix O&M on a case-to-case basis for a deemed distribution licensee whose tariff is yet to be determined (p7). Existing hydro stations may separately claim housing colony, medical and operating-staff costs (p6). The Regulations take effect from the date of publication in the Official Gazette, which is not printed (p5); a closing note records that the principal Regulations were gazetted on 8 December 2015 (p8).
Read with this
The regulation
- Dated 8 Dec 2015Multi Year Tariff Regulations, 2015
Commencement notices and reasons
Procedures and orders made under it
- Dated 5 Jan 2016Extension of Time for Filing of Multi Year Tariff Petition by MSETCL under MYT Regulations, 2015 — 2016
- Dated 15 Jan 2016MYT Petition Filing Extension Order, 15 January 2016
- Dated 30 Nov 2017Extension of time for filing of Mid Term Review Petition under the Multi Year Tariff Regulations, 2015 — 30 November 2017
- Dated 26 Dec 2017Extension of time for filing Mid Term Review Petition by Tata Power Generation and Distribution Business, 2017
Proposed changes (drafts with no final yet)
- Dated 9 Sep 2015Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
Earlier drafts
- Released with the notice dated 9 Sep 2015Multi Year Tariff Regulations, 2015 — Draft
- Released with the notice dated 26 Oct 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft
- Dated 26 Oct 2017Public notice: Multi Year Tariff Regulations, 2015 — Proposed Amendment, 2017 — Public Notice
- Dated 26 Oct 2017Explanatory memorandum: Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.