WBERC · West Bengal Electricity Regulatory Commission
West Bengal Open Access Regulations, 2022 — Draft
West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2022
Draft regulationDated 10 May 2022WBERC/Regu-54 (Open Access)/ dated 10th May, 2022
Draft
A proposal that has since been finalised as the Open Access Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
On 10 May 2022 the West Bengal Electricity Regulatory Commission issued a public notice (p1) publishing the draft WBERC (Open Access) Regulations, 2022 and inviting suggestions, objections and comments to be filed with the Commission by 2 June 2022, 3 P.M. The draft is issued in supersession of the Commission's 2007 Open Access regulations (Notification No. 35/WBERC dated 12 April 2007), which clause 38 would repeal while preserving action already taken under them (p1, p62). The document itself is the draft text: a contents page (pp2–3), the draft notification and 38 regulations (pp4–62), a Schedule of charges (p63) and three annexure formats (pp64–72).
Regulations 1–3 give the short title, provide that the regulations take effect on publication in the Official Gazette, and set out the extent of application, with an overriding effect over earlier regulations and orders. Regulations 4–8 deal with eligibility for transmission and distribution access, special provisions for existing distribution licensees, allotment priority, the criteria and formulas for assessing technical feasibility and available capacity, and nomination of the Nodal Agency — the STU for long- and medium-term access and the SLDC for short-term access (pp11–18).
Regulations 9–14 set the application procedure and fee table, and the grant procedures for long-term, medium-term and short-term Open Access, including advance reservation, congestion bidding, first-come-first-served and day-ahead/same-day/contingency transactions, power-exchange access through NOAR, and the restriction on repetitive short-term drawal (pp18–32). Regulation 15 establishes the agreement architecture — connectivity agreement, PPA, Open Access agreement, Additional Transmission/Wheeling Asset Creation Agreements, backup-power arrangements and Commission approval of standard agreements (pp32–40). Regulations 16–18 require SLDC and STU detailed procedures, govern non-utilisation, surrender and relinquishment of capacity, and enumerate the heads of charges: transmission, wheeling, deviation settlement, cross-subsidy surcharge, additional surcharge and other charges (pp40–50).
Regulations 19–33 cover technical loss allocation, energy accounting, payment modes and payment security, application formats, metering and communication, grid discipline, curtailment priority and charges during curtailment, licensee obligations and network-availability targets, the SLDC information-dissemination regime, statutory obligations under sections 11 and 23, the status of existing Open Access customers and revision of schedules (pp50–60). Regulations 34–38 provide for dispute resolution, powers to intervene, remove difficulties and amend, and repeal and savings (pp60–62).
Read with this
The regulation
- Dated 1 Aug 2022Open Access Regulations, 2022
Commencement notices and reasons
- Date not statedOpen Access Regulations, 2022 — Statement of Reasons
Proposed changes (drafts with no final yet)
- Dated 3 Oct 2024Open Access Regulations, 2022 — First Amendment, 2024 — Draft
- Released with the draft dated 3 Oct 2024Explanatory memorandum: Open Access (First Amendment) Regulations, 2024 — Explanatory Memorandum
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.