WBERC · West Bengal Electricity Regulatory Commission
Open Access (First Amendment) Regulations, 2024 — Explanatory Memorandum
West Bengal Electricity Regulatory CommissionExplanatory MemorandumtoWest Bengal Electricity Regulatory Commission(Open Access) (First Amendment) Regulations, 2024
Explanatory memorandum to a draftReleased with the draft dated 3 Oct 2024
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Open Access Regulations, 2022 — First Amendment, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the explanatory memorandum the West Bengal Electricity Regulatory Commission has issued alongside its draft WBERC (Open Access) (First Amendment) Regulations, 2024. It is the reasoning document, not the operative text: it explains why the Commission proposes to amend its 2022 open access regulations and what the amendment is meant to achieve (p1).
Paragraphs 1–4 set out the legal chain relied on: the Central Government's rule-making power under s.176(1) of the Electricity Act, 2003, the resulting Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, the State Commission's duty under s.86(1)(e) to promote renewable generation, and its regulation-making power under s.180(1) (p1).
Paragraphs 5–6 explain that the Commission has already folded the Green Energy Open Access Rules into the WBERC (Open Access) Regulations, 2022 for consumers at 100 kW and above, and that it is now responding to the Ministry of Power amendments of 27 January 2023 and 23 May 2023, which recast eligibility around aggregated sanctioned load across multiple connections within a licensee's electricity division (p1–2).
Paragraph 7 summarises the central features of the Green Energy Open Access scheme as the Commission reads them: promotion of green energy including waste-to-energy, extension of open access to consumers with aggregate contracted demand or sanctioned load of 100 kW or more through a single or multiple connections in the same division, captive consumers exempt from the load restriction, and banking of surplus green energy with the connected distribution licensee subject to applicable charges (p2).
Paragraphs 9–11 set out the Rule 5 obligations — the power to amend regulations for consistency, and one-window receipt and registration of applications with disposal within fifteen days by the nodal agency for intra-State green energy open access, CERC regulations governing the inter-State case — and state that the Rules as amended to 23 May 2023 have been carried into the draft amendment (p3).
Paragraphs 12–13 identify the substantive changes proposed: a banking charge of 8% of energy banked, following the forum of regulators' model regulation methodology as adopted by APERC and TSERC, and scheduling charges for the daily final implemented schedule of SLDC and ALDC (p3).
The memorandum closes with the Commission's order, signed by its Secretary at Kolkata; no date is printed (p3).
Read with this
The regulation
- Dated 1 Aug 2022Open Access Regulations, 2022
Commencement notices and reasons
- Date not statedOpen Access Regulations, 2022 — Statement of Reasons
Proposed changes (drafts with no final yet)
- Dated 3 Oct 2024Open Access Regulations, 2022 — First Amendment, 2024 — Draft
Earlier drafts
- Dated 10 May 2022West Bengal Open Access Regulations, 2022 — Draft
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.