Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Open Access Regulations, 2022 — First Amendment, 2024 — Draft

West Bengal Electricity Regulatory Commission (Open Access) (First Amendment) Regulations, 2024

Draft amendmentDated 3 Oct 2024WBERC/Regulation-78/24-25/ 5546 dated 03rd October, 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 3 October 2024 the West Bengal Electricity Regulatory Commission published a public notice (p1) inviting comments, suggestions and objections on the draft West Bengal Electricity Regulatory Commission (Open Access) (First Amendment) Regulations, 2024, to be filed by 14 November 2024 at 3 P.M. The draft regulation attached to it (pp2–8) would make thirteen changes to the WBERC (Open Access) Regulations, 2022, notified on 1 August 2022.

The draft inserts a definition of the State Grid Code ("WBEGC") (p2) and restates the eligibility gate for Green Energy Open Access, limiting it to consumers with contracted demand or sanctioned load of 100 (Hundred) kW or more, single or aggregate within the same billing division/Region/Zone (pp2–3). It routes Green Energy Open Access applications through the Central Nodal Agency's portal with simultaneous payment of State Nodal Agency fees (p3), and tightens long-term and medium-term open access consent timelines, the reasoning that must accompany a refusal, and the rule that a dedicated transmission line is not system strengthening (pp3–4).

The centrepiece is a new regulation 14A (pp4–6), which creates a banking facility for Green Energy Open Access: what banking means and the adjustment made to compensate the distribution licensee, alignment of the banking cycle with the billing cycle, the minimum quantum of banked energy allowed, lapse of unutilised banked energy with an REC entitlement in its place, Time-of-Day ordering of banked energy, 15-minute block scheduling, a deadline for SLDC to frame the scheduling procedure, the ALDC's role where injection and drawal fall in the same distribution licence area, a model banking agreement on the licensee's website, and non-transferability.

Later clauses exempt non-fossil-fuel waste-to-energy from cross-subsidy surcharge (p6) and from additional surcharge (p7), exempt offshore wind commissioned up to December 2032 from additional surcharge (p7), restate the short-term open access advance-payment and bank-guarantee regime (pp7–8), and add reporting of Green Open Access applications (p8). The regulations would take effect on Gazette publication, and the notification number and date are left blank (p2).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Energy banking

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document