Summary
Summary written by software. Check the regulator's original before you rely on it.
On 3 October 2024 the West Bengal Electricity Regulatory Commission published a public notice (p1) inviting comments, suggestions and objections on the draft West Bengal Electricity Regulatory Commission (Open Access) (First Amendment) Regulations, 2024, to be filed by 14 November 2024 at 3 P.M. The draft regulation attached to it (pp2–8) would make thirteen changes to the WBERC (Open Access) Regulations, 2022, notified on 1 August 2022.
The draft inserts a definition of the State Grid Code ("WBEGC") (p2) and restates the eligibility gate for Green Energy Open Access, limiting it to consumers with contracted demand or sanctioned load of 100 (Hundred) kW or more, single or aggregate within the same billing division/Region/Zone (pp2–3). It routes Green Energy Open Access applications through the Central Nodal Agency's portal with simultaneous payment of State Nodal Agency fees (p3), and tightens long-term and medium-term open access consent timelines, the reasoning that must accompany a refusal, and the rule that a dedicated transmission line is not system strengthening (pp3–4).
The centrepiece is a new regulation 14A (pp4–6), which creates a banking facility for Green Energy Open Access: what banking means and the adjustment made to compensate the distribution licensee, alignment of the banking cycle with the billing cycle, the minimum quantum of banked energy allowed, lapse of unutilised banked energy with an REC entitlement in its place, Time-of-Day ordering of banked energy, 15-minute block scheduling, a deadline for SLDC to frame the scheduling procedure, the ALDC's role where injection and drawal fall in the same distribution licence area, a model banking agreement on the licensee's website, and non-transferability.
Later clauses exempt non-fossil-fuel waste-to-energy from cross-subsidy surcharge (p6) and from additional surcharge (p7), exempt offshore wind commissioned up to December 2032 from additional surcharge (p7), restate the short-term open access advance-payment and bank-guarantee regime (pp7–8), and add reporting of Green Open Access applications (p8). The regulations would take effect on Gazette publication, and the notification number and date are left blank (p2).
Read with this
The regulation
- Dated 1 Aug 2022Open Access Regulations, 2022
Commencement notices and reasons
- Date not statedOpen Access Regulations, 2022 — Statement of Reasons
Proposed changes (drafts with no final yet)
- Released with the draft dated 3 Oct 2024Explanatory memorandum: Open Access (First Amendment) Regulations, 2024 — Explanatory Memorandum
Earlier drafts
- Dated 10 May 2022West Bengal Open Access Regulations, 2022 — Draft
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.