Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Open Access Regulations, 2022 — Statement of Reasons

Statement of Reasons (SOR) of West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2022

Statement of reasonsDate not stated

The commission's reasons for the Open Access Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 98. Check the regulator's original before you rely on it.

This is the Statement of Reasons for the WBERC (Open Access) Regulations, 2022. It explains why the Commission realigned the State's intra-state open access framework with CERC's inter-state open access and deviation settlement regimes, replacing the existing 2007 regulations as amended in 2009 and 2019 (p1–2). It records that a 2017 draft was followed by the draft Open Access Regulations published on 10 May 2022, comments due 02.06.2022, submissions from twelve stakeholders, and incorporation of the Green OA Rules even though they were notified on 06.06.2022, after the comment deadline (p2). Pages 2–5 list headline changes: medium-term open access, DSM, nodal agency responsibility on SLDC/STU, new and renamed definitions, removal of standby/incidental power and the supplier definition, SLDC/STU detailed procedures, surcharge clarifications, allocation priority, simplified application fee, six forms of agreement, curtailment on underutilisation, wheeling/transmission charge treatment, reduced HV technical loss and an information dissemination system (p2–5). From page 5 to page 29 the SOR works clause by clause through stakeholder comments and the Commission's stand: preamble and vires (p5–7); definitions and interpretation (p7–15); eligibility, green energy open access, dues and disputes (p15–23); backup power and critical load (p19–21); priority in allocation (p24–26); technical feasibility and capacity availability (p26–29); and correction of wrong cross-references (p28). It is not the regulation itself; it records what the Commission accepted, rejected or modified.

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Open access, Green energy open access, Deviation settlement (DSM)

Read with this

The regulation

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document