Renewable Power Purchase Obligation and its Compliance Regulations, 2012

Renewable Power Purchase Obligation And Its Compliance Regulations - 2012

RegulationDated 11 Apr 2012

3 amendments to it are on Voltaic, the latest dated 10 Sep 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APSERC issued these regulations to create and enforce a renewable power purchase obligation (RPPO) in Arunachal Pradesh, publishing them in the State Gazette of 13 April (p1). They are made under the Electricity Act 2003, chiefly s.86(1)(e) and s.181, and come into force on the date of publication in the Gazette (p1).

Regulations 1–2 (p1–2) give the short title and commence the definitions — obligated entity, renewable energy sources, certificate, Central Agency and State agency. Regulation 3 (p2) fixes who is covered: the distribution licensee, plus any person consuming electricity from a captive plant of 1 MW and above for own use, or procured through open access / third-party sale. Regulation 4 (p2–3) sets the obligation itself — rising minimum percentages of total consumption, split into solar and non-solar, across 2012-13 to 2014-15, with the 2014-15 level continuing until the Commission revises it, and a power to revise targets for a year in view of supply constraints.

Regulation 5 (p4) makes CERC renewable energy certificates the instrument of compliance, with solar and non-solar obligations to be met by matching certificates deposited with the Commission. Regulation 6 (p4–5) designates APEDA as State Agency for accreditation, recommending projects for registration, certificate accounts and repository, and requires it to get quarterly compliance-report formats approved within three months.

Regulations 7–8 (p5–6) place duties on distribution licensees (declare estimated renewable purchases in tariff/annual performance review petitions; shortfalls carry forward, excess is not credited) and on captive/open access consumers (annual reporting by 30 April; certificate route available). Regulation 9 (p6) sets default consequences: a ring-fenced fund sized on the shortfall and the CERC forbearance price, usable only for certificates and RE evacuation infrastructure, licence breach for non-deposit within 15 days, and s.142 penalty, with a carry-forward escape for genuine certificate non-availability.

Regulations 10–14 (p7) give the regulations overriding effect over the Commission's tariff and open access regulations, and reserve to the Commission powers to remove difficulties, issue orders and practice directions, depart from its own procedure and decide interpretation finally.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Compliance and reporting, Renewable energy certificates (REC)

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.