Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment — Draft

APSERC (Renewable Purchase Obligation and its compliance) Regulations, 2025(Third Amendment)

Draft amendmentDated 7 Aug 2025No. APSERC/NOTIFICATION/2025 dated THE 7 th August, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft third amendment to Arunachal Pradesh's 2012 Renewable Power Purchase Obligation and its Compliance Regulations, issued by APSERC on 7 August 2025 and taking effect on publication in the State's official Gazette (p1). It replaces Regulation 4 of the principal regulation — the RPO trajectory — and adds the notes and compliance machinery that go with it, expressly to carry out the Ministry of Power's 20 October 2023 notification S.O. 4617(E) on minimum non-fossil consumption shares (p1).

Regulation 2 substitutes a year-by-year table for FY 2024-25 to FY 2029-30, split into wind, hydro, distributed, other and total renewable energy components (p1). Note 1 halves the distributed component for Arunachal Pradesh and folds the balance into 'other', leaving the total unchanged (p2). Notes 2 to 5 set the eligibility rules for each component: wind and hydro only from projects commissioned after 31 March 2024, with hydro including pumped storage, small hydro and free power to the State/DISCOM; distributed only from installations below 10 MW under any metering configuration, with a conversion multiplier where generation data is missing; and 'other' from projects commissioned before 1 April 2024 (p2).

Paragraphs 3 to 6 make the wind and hydro components interchangeable in either direction, let excess wind or hydro count as other, let excess other cover a wind or hydro shortfall, and require open access and captive consumers to meet only the total target regardless of source (p2–3). Paragraph 7 permits compliance through renewable energy certificates under the CERC 2022 REC regulations, and paragraph 8 treats any shortfall as non-compliance attracting penalty (p3). Paragraphs 9 to 11 designate APEDA as the State Agency to monitor RPO compliance and report quarterly to the Commission, place data-keeping with the Bureau for reporting to the Central Government, and state that the trajectory holds until FY 2029-30, with future changes following Ministry of Power notifications (p3).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document