APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment — Draft
APSERC (Renewable Purchase Obligation and its compliance) Regulations, 2025(Third Amendment)
Draft amendmentDated 7 Aug 2025No. APSERC/NOTIFICATION/2025 dated THE 7 th August, 2025
Draft
A proposal that has since been finalised as the Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft third amendment to Arunachal Pradesh's 2012 Renewable Power Purchase Obligation and its Compliance Regulations, issued by APSERC on 7 August 2025 and taking effect on publication in the State's official Gazette (p1). It replaces Regulation 4 of the principal regulation — the RPO trajectory — and adds the notes and compliance machinery that go with it, expressly to carry out the Ministry of Power's 20 October 2023 notification S.O. 4617(E) on minimum non-fossil consumption shares (p1).
Regulation 2 substitutes a year-by-year table for FY 2024-25 to FY 2029-30, split into wind, hydro, distributed, other and total renewable energy components (p1). Note 1 halves the distributed component for Arunachal Pradesh and folds the balance into 'other', leaving the total unchanged (p2). Notes 2 to 5 set the eligibility rules for each component: wind and hydro only from projects commissioned after 31 March 2024, with hydro including pumped storage, small hydro and free power to the State/DISCOM; distributed only from installations below 10 MW under any metering configuration, with a conversion multiplier where generation data is missing; and 'other' from projects commissioned before 1 April 2024 (p2).
Paragraphs 3 to 6 make the wind and hydro components interchangeable in either direction, let excess wind or hydro count as other, let excess other cover a wind or hydro shortfall, and require open access and captive consumers to meet only the total target regardless of source (p2–3). Paragraph 7 permits compliance through renewable energy certificates under the CERC 2022 REC regulations, and paragraph 8 treats any shortfall as non-compliance attracting penalty (p3). Paragraphs 9 to 11 designate APEDA as the State Agency to monitor RPO compliance and report quarterly to the Commission, place data-keeping with the Bureau for reporting to the Central Government, and state that the trajectory holds until FY 2029-30, with future changes following Ministry of Power notifications (p3).
Read with this
The regulation
Amendments and corrections
- Dated 25 Feb 2016Renewable Power Purchase Obligation and its Compliance Regulations, 2012 — 1st Amendment, 2016
- Dated 5 Oct 2016Renewable Power Purchase Obligation and its Compliance Regulations, 2012 — 2nd Amendment, 2016
- Dated 10 Sep 2025Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment
Earlier drafts
- Dated 7 Aug 2025Public notice: Draft Renewable Purchase Obligation and its Compliance Regulations — Third Amendment, 2025 — Public Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.