Renewable Power Purchase Obligation and its Compliance Regulations, 2012 — 1st Amendment, 2016

Arunachal Pradesh State Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (1st Amendment) Regulations, 2016

AmendmentDated 25 Feb 2016Published in the Gazette 1 Apr 2016No APSERC/NOTIFICATION/19/2016 dated The 25th February, 2016

Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending notification by the Arunachal Pradesh State Electricity Regulatory Commission that rewrites the renewable purchase obligation in its 2012 RPPO Regulation. The recitals explain the trigger: the 2012 trajectory stopped at 2014-15 and was carried forward, and the Ministry of Power's new Tariff Policy of 28 January 2016 required SERCs to fix a minimum renewable percentage of consumption and reserve a solar share within it, reaching 8% of consumption excluding hydro by March 2022 (p1).

Regulation 1 gives the short title and commencement: the amendment is in force from the date of issue of the notification, 25 February 2016, although the Gazette copy is dated 1 April 2016 (p1). Regulation 2 deletes Regulation 4 of the 2012 Regulations and substitutes a new Regulation 4 reproduced verbatim (p1–2). Regulation 3 leaves every other provision of the 2012 Regulations unchanged (p2).

The substituted Regulation 4(a) prescribes a year-wise minimum purchase table running from 2016-17 to 2021-22, split into total, non-solar and solar columns, and specifies how each is computed: the non-solar obligation on total consumption including T&D losses, the solar obligation on consumption excluding hydro power, also including T&D losses, with solar RPO to be met from solar generation only. The obligation is defined as inclusive of purchases from renewable generators, from other distribution licensees on renewable account, and the obligated entity's own renewable generation; existing renewable PPAs continue to their stated validity even if they exceed the percentage. Regulation 4(b) allows the Commission, on a licensee's request citing supply constraints, to revise a year's targets, and 4(c) carries the 2021-22 obligation forward beyond that year until revised (p2).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document