APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Renewable Purchase Obligation and its Compliance Regulations, 2025 — Third Amendment
APSERC (Renewable Purchase Obligation and its compliance) Regulations, 2025 (Third Amendment).
AmendmentDated 10 Sep 2025Published in the Gazette 15 Sep 2025APSERC/NOTIFICATION/52/2025 dated The 10th September, 2025
Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the third amendment to APSERC's Renewable Power Purchase Obligation and its Compliance Regulations, 2012. It was issued on 10 September 2025 and published in the Arunachal Pradesh Gazette on 15 September 2025, the date it comes into force (p1).
The operative change replaces the RPO trajectory in Regulation 4 of the Principal Regulation with a year-wise table running from FY 2024-25 to FY 2029-30, split into wind, hydro, distributed, other and total renewable energy components (p1). The preamble anchors this to the Ministry of Power's S.O. 4617(E) of 20 October 2023 on minimum non-fossil consumption shares for designated consumers (p1).
The notes to the table do most of the substantive work (p2). Note 1 halves Arunachal Pradesh's distributed renewable energy component and folds the remainder into the 'other' bucket. Notes 2–5 define which projects count against each component: wind and hydro only from projects commissioned after 31 March 2024 (hydro may be met from free power to the State/DISCOM); distributed only from projects under 10 MW across all solar configurations, with a daily capacity-to-energy multiplier where generation data is missing; and 'other' from pre-1 April 2024 projects. Clauses 3–5 allow shortfalls in wind or hydro to be swapped with each other or with the other component. Clause 6 requires open access and captive consumers to meet the total target irrespective of source; clause 7 permits compliance through RECs under the CERC 2022 framework; clause 8 treats shortfall as non-compliance penalised under the Energy Conservation Act; clause 9 extends APEDA's role to RPO monitoring with quarterly reports to the Commission; clauses 10–11 cover BEE data reporting and the validity of the trajectory (p2).
Read with this
The regulation
Amendments and corrections
Earlier drafts
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.