Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Renewable Power Purchase Obligation and its Compliance Regulations, 2012 — 2nd Amendment, 2016

Arunachal Pradesh State Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (2nd Amendment) Regulations, 2016

AmendmentDated 5 Oct 2016Published in the Gazette 13 Oct 2016APSERC/NOTIFICATION/20/2016 dated The 5th October, 2016

Amends the Renewable Power Purchase Obligation and its Compliance Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short APSERC notification that rewrites the state's renewable purchase obligation (RPO) quantum so that it matches the trajectory issued by the Ministry of Power. The preamble (p1) sets out the chain of events: the APSERC Renewable Power Purchase Obligation and its Compliance Regulation, 2012 had been amended by a 1st Amendment notified on 25 February 2016 (gazetted 1 April 2016), but the trajectory it set did not match the long-term RPO trajectory later prescribed by the Ministry of Power on 22 July 2016 under Clause 6.4(1)(i) of the Tariff Policy, 2016. The Ministry's trajectory is reproduced in a table on p1. The Commission therefore substitutes Regulation 4 of the 2012 Regulations, which deals with the quantum of the obligation.

Page 2 carries the operative text. Clause 1 gives the short title and says the amendment takes effect from the date of issue of the notification. Clause 2 deletes Regulation 4 and substitutes a new Regulation 4 containing: a year-wise table of minimum renewable purchase percentages for 2016-17, 2017-18 and 2018-19 split into total, non-solar and solar; the measurement basis for each — non-solar RPO against total consumption including T&D losses, solar-specific RPO against consumption excluding hydro power and also including T&D losses, with the solar obligation to be met from solar generation alone; what counts towards discharging the obligation (own renewable generation, purchases from other licensees arising from renewables, purchases from renewable generating stations); a proviso that existing renewable PPAs of distribution licensees run to their existing validity even if they overshoot the prescribed percentage; power for the Commission to revise a year's targets on a licensee's request for supply constraints or factors beyond its control; and a statement that RPO beyond 2018-19 will be specified separately. Clause 3 saves every other regulation of the 2012 Regulations.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document