Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the draft Gujarat Electricity Grid Code, 2013, issued by the Gujarat Electricity Regulatory Commission as the state grid code for the Gujarat power grid (p1–2). It is made under s.86(h) of the Electricity Act, 2003 and s.42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 and says it will come into force on publication in the official gazette; the gazette date is not printed. It supersedes the Gujarat Electricity Grid Code, 2004, which took effect on 25-8-2004 (p3). It applies to Gujarat's intra-state grid; inter-state transmission is governed by the Indian Electricity Grid Code (p2).
After a preamble and notification (p2), definitions (p17–30), and abbreviations (p8–11), the code sets out governance: STU/GETCO implements it, a Grid Code Review Panel manages revisions, and GERC approves amendments (p31–34). The roles and duties of STU, SLDC, sub-SLDC, shift in-charges and the State Grid Operation Coordination Committee are listed (p34–38).
Chapters 4–5 set planning and connection obligations: 10-year load forecasting, planning data, CEA planning criteria, transmission planning for renewables, connection procedure, reactive compensation, communication, recording instruments, cyber security, and inverter-based wind/solar connectivity standards (p39–50). Chapter 6 is the system operation code: demand estimation, outage planning, operating margin, demand control and disconnection, system security, system operation and despatch, WAMS, metering and protection, monitoring of generation and drawal, contingency planning and black-start restoration (p51–68). Chapter 7 covers cross-boundary safety and line clear permits (p69–72). Chapter 8 covers SCADA, communication and data acquisition (p73–74). Chapter 9 covers reporting of operational events, incidents, warnings and accident reporting (p75–79). Chapter 10 covers registration and submission of data (p80–81). Chapter 11 is the scheduling and despatch code, with responsibilities, scheduling timelines, revision rules, curtailment priority, reactive power and voltage control, UI and reactive-energy accounts, and complementary commercial mechanisms (p82–94). Annexures A–K provide planning and security standards, data templates, connectivity standards, metering and protection standards, line-clear forms, special energy meter requirements and reactive-energy payment examples (p95–145).
Read with this
The regulation
- Dated 15 Jul 2013Gujarat Electricity Grid Code, 2013
Proposed changes (drafts with no final yet)
- Dated 5 Feb 2016Gujarat Electricity Grid Code Regulations, 2013 — First Amendment, 2016 — Draft
- Dated 4 Feb 2016Explanatory memorandum: Gujarat Electricity Grid Code — First Amendment, 2016 — Draft — Explanatory Note
- Dated 14 May 2026Gujarat Electricity Grid Code, 2026 — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.