Skip to content

GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Grid Code Regulations, 2013 — Draft

Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013

Draft codeDated 16 Jan 2013

Draft

A proposal that has since been finalised as the Gujarat Electricity Grid Code, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the draft Gujarat Electricity Grid Code, 2013, issued by the Gujarat Electricity Regulatory Commission as the state grid code for the Gujarat power grid (p1–2). It is made under s.86(h) of the Electricity Act, 2003 and s.42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 and says it will come into force on publication in the official gazette; the gazette date is not printed. It supersedes the Gujarat Electricity Grid Code, 2004, which took effect on 25-8-2004 (p3). It applies to Gujarat's intra-state grid; inter-state transmission is governed by the Indian Electricity Grid Code (p2).

After a preamble and notification (p2), definitions (p17–30), and abbreviations (p8–11), the code sets out governance: STU/GETCO implements it, a Grid Code Review Panel manages revisions, and GERC approves amendments (p31–34). The roles and duties of STU, SLDC, sub-SLDC, shift in-charges and the State Grid Operation Coordination Committee are listed (p34–38).

Chapters 4–5 set planning and connection obligations: 10-year load forecasting, planning data, CEA planning criteria, transmission planning for renewables, connection procedure, reactive compensation, communication, recording instruments, cyber security, and inverter-based wind/solar connectivity standards (p39–50). Chapter 6 is the system operation code: demand estimation, outage planning, operating margin, demand control and disconnection, system security, system operation and despatch, WAMS, metering and protection, monitoring of generation and drawal, contingency planning and black-start restoration (p51–68). Chapter 7 covers cross-boundary safety and line clear permits (p69–72). Chapter 8 covers SCADA, communication and data acquisition (p73–74). Chapter 9 covers reporting of operational events, incidents, warnings and accident reporting (p75–79). Chapter 10 covers registration and submission of data (p80–81). Chapter 11 is the scheduling and despatch code, with responsibilities, scheduling timelines, revision rules, curtailment priority, reactive power and voltage control, UI and reactive-energy accounts, and complementary commercial mechanisms (p82–94). Annexures A–K provide planning and security standards, data templates, connectivity standards, metering and protection standards, line-clear forms, special energy meter requirements and reactive-energy payment examples (p95–145).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

The regulation

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document