This is the Gujarat Electricity Regulatory Commission's draft First Amendment to the Gujarat Electricity Grid Code Regulations, 2013, signed at Gandhinagar on 5 February 2016 (p13). It is a clause-by-clause amending instrument: 35 numbered paragraphs, each substituting, deleting or adding a specific provision of the principal Code, grouped by the regulation they touch (p1).
Preliminary provisions give the short title and make the amendment effective from gazette publication, with the notification number left blank (p1). Regulation 2 of the principal Code is reworked: a DSM abbreviation is added, definitions of Demand Response, State Pool Account and Short-term Open Access are substituted, the definitions of 'Notice to Synchronize' and 'Unscheduled Interchange' are deleted, and new definitions of Pooling Station, buyer, seller and Deviation are inserted (p2–4). A rationale paragraph on scheduling wind and solar generators is appended to clause 1.5(11) (p1–2).
The remaining paragraphs amend Regulations 3 to 11. Regulation 3 is amended to widen SLDC's account-operation functions (p4); Regulation 4 gains a note on minimum safety working clearance for bare conductors in 24 kV outdoor substations (p4); the Regulation 5 clause on wind and inverter-based solar stations is replaced with connectivity standards for stations at 66 kV and above — reactive power capability, fault ride-through and harmonic limits, with six-monthly measurement and reporting (p4–5).
The bulk of the draft covers Regulation 6 (grid discipline) and Regulation 11 (scheduling and commercial settlement). Regulation 6 clauses are replaced to require licensees and bulk consumers to stay within net drawal schedules, to define SLDC's contingency message formats and compliance reporting, to require free governor operation on hydro units of 50 MW and above and thermal units of 200 MW and above (with exemptions), and to restate frequency-band, sudden-change-intimation and black-start obligations (p5–7). Regulation 8 clauses on SCADA-based operational metering, real-time data and a possible Renewable Energy Management Centre are replaced (p8). Regulation 11 is substantially rewritten: the scheduling objective, SLDC scheduling responsibilities, ADMS-based drawal control, deviation pricing through DSM and congestion charges, deletion of clause 11.9, grid-disturbance revision of schedules, pro-rata reduction provisos, a dedicated wind/solar scheduling clause with forecasting and revision windows, and the deviation-charge accounting, payment and interest regime (p8–13).
Read with this
The regulation
- Dated 15 Jul 2013Gujarat Electricity Grid Code, 2013
Proposed changes (drafts with no final yet)
- Dated 14 May 2026Gujarat Electricity Grid Code, 2026 — Draft
- Dated 4 Feb 2016Explanatory memorandum: Gujarat Electricity Grid Code — First Amendment, 2016 — Draft — Explanatory Note
Earlier drafts
- Dated 16 Jan 2013Gujarat Electricity Grid Code Regulations, 2013 — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.