Gujarat Electricity Grid Code — First Amendment, 2016 — Draft — Explanatory Note

Draft Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) (First Amendment) Regulations, 2016

Explanatory memorandum to a draftDated 4 Feb 2016

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Gujarat Electricity Grid Code Regulations, 2013 — First Amendment, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's explanatory note for the draft Gujarat Electricity Grid Code (First Amendment) Regulations, 2016. It explains why GERC proposes to amend the Gujarat Electricity Grid Code Regulations, 2013 (notified 16 July 2013) and summarises ten proposed changes; it does not reproduce the amending clauses themselves (p1–4).

The opening pages set out the background: the Grid Code Review Panel, the 2012 grid disturbances, CERC's amendments to the Indian Electricity Grid Code, CERC's Deviation Settlement Mechanism Regulations, 2014 superseding the 2009 UI regulations, and CERC's proposed RE forecasting/scheduling framework (p1–2).

The numbered points then cover: narrowing the frequency band to 49.90–50.05 Hz, aligning DSM charges and pool account provisions with CERC DSM 2014 and adding definitions of Deviation, Pooling Station, Buyer and Seller; deleting frequency-linked support limits; adding a 2.8 m safety clearance for 24 kV highest system voltage; aligning wind and solar inverter connectivity with the CEA 2013 amendment, including reactive power capability and fault ride-through; adding a frequency limit for restricted governor mode; requiring half-yearly mock black-start/restoration trials; clarifying schedule revision after grid disturbance and pro-rata reduction for beneficiaries of a short-term transaction generator under forced outage; and allowing up to 16 schedule revisions per 1.5-hour slot for wind/solar instead of 8 (p2–4).

For an analyst, this is the rationale and scope map for the First Amendment, not the operative text. It matters for Gujarat grid users and for tracking how Gujarat aligns its Grid Code with CERC and CEA frameworks on DSM and renewable integration.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Deviation settlement (DSM), Scheduling and despatch

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document