Skip to content

GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Grid Code, 2013

Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013

CodeDated 15 Jul 2013Published in the Gazette 16 Jul 2013

Replaced by Gujarat Electricity Grid Code, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 22 of 103. Check the regulator's original before you rely on it.

The Gujarat Electricity Grid Code, 2013 is a principal GERC regulation published in the Gujarat Government Gazette (Extraordinary) of 16 July 2013 as Extra No. 463 (p1). It is made under Section 86(h) of the Electricity Act, 2003 and Section 42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003, applies to the Gujarat power grid only — inter-state transmission is left to the Indian Electricity Grid Code — takes effect from gazette publication, and supersedes the Gujarat Electricity Grid Code, 2004 (p1).

Chapter 1 (pp8–11) sets the frame. It restates the statutory roles of GETCO as State Transmission Utility and of the SLDC, fixes the code's scope as the technical and procedural obligations of the STU, transmission licensees and all users connected to the system, sketches the eleven-part structure, and places implementation responsibility on the STU/transmission licensee, with users obliged to supply information and access (p10). Persistent non-compliance can lead to disconnection with the user bearing the consequences, and the Commission may act suo motu (p10). Because the code cannot foresee every operating condition, SLDC/STU action in such cases must be referred to the Grid Code Review Panel for ratification; user information stays confidential and interpretation disputes go to GERC (pp10–11). GSECL's Kadana and Ukai hydro stations get special scheduling treatment because they run in coordination with irrigation requirements (p8).

Chapter 2 (pp12–22) is the definitional layer: 165 defined terms spanning plant and protection vocabulary, transmission and metering concepts, scheduling and despatch, open access and market transactions, energy accounting, and the institutional bodies, followed by an interpretation clause (p22).

The contents table (pp2–4) maps the parts not supplied in this extract: Chapter 3 management of the code and the Review Panel; Chapter 4 system planning; Chapter 5 connection code; Chapter 6 system operation code (operation planning and security; metering and protection; monitoring of generation and drawal; contingency planning); Chapter 7 safety and line clear permits; Chapter 8 communication and SCADA; Chapter 9 event and accident reporting; Chapter 10 data registration; Chapter 11 schedule and despatch code including reactive power/voltage control and the complementary commercial mechanism; and Annexures A–K (pp68–103).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document