Gujarat Electricity Grid Code, 2026 — Draft

Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2026

Draft regulationDated 14 May 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission issued this draft Gujarat Electricity Grid Code, 2026 as the successor to the Gujarat Electricity Grid Code, 2013 (p1–2). It is made under sections 181, 39, 40, 42 and 86(1)(h) of the Electricity Act, 2003 and section 42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003, applies only to the Gujarat State power grid — the inter-State network stays with CERC's Indian Electricity Grid Code — and takes effect on publication in the Official Gazette, superseding the 2013 Code dated 16 July 2013 (p2). The signature block is dated 14.05.2026 (p224), and the repeal-and-savings clause preserves everything done under the old Code (p223).

Chapter 1 sets out the objectives and scope — who must comply, how the Code is implemented, confidentiality and referral of disputes to the Commission — and lists the 15 chapters (p8–17). Chapter 2 defines the Code's working vocabulary in a table of over 200 terms, with interpretation rules and fallback to the Act and general industry usage (p18–40). Chapter 3 fixes the roles of the State Transmission Utility, SLDC, three Sub-SLDCs, the proposed Distribution System Operator, the State Operation Coordination Committee and the Protection Coordination Committee, including composition and functions (p41–46).

Chapter 4 is the Resource Planning Code: it obliges distribution licensees to forecast demand and plan generation resource procurement, requires demonstrable generation resource adequacy against a planning reserve margin, and makes the STU responsible for a rolling ten-year intra-State transmission plan (p47–54). It then specifies planning philosophy and methodology — modelling down to 66 kV, load-generation scenarios, planning margins, power flow, short-circuit, stability, TTC/ATC, EMT and inertia studies — plus the N-0/N-1/N-1-1 reliability and contingency criteria, substation and transformer criteria, reactive compensation (shunt capacitors, reactors, FACTS, synchronous condensers), HVDC and wind/solar/hybrid planning criteria, resilience measures and minimum electrical clearances (p54–84).

Chapter 5 governs connection: compliance with listed CEA/CERC/GERC instruments, application and connection agreement procedures, a joint system study before first energisation, reactive compensation, data and communication facilities, recording instruments, cyber security and metering (p85–91). Chapter 6 sets the protection protocol, the Protection Coordination Committee's functions, yearly review of protection settings, and annual internal plus five-yearly third-party audit obligations with performance indices (p92–97). Chapter 7 covers commissioning and commercial operation — start-up power drawal and infirm power injection windows, trial-run requirements by technology (thermal, hydro, solar, wind, ESS/PSP/hybrid, transmission), the documents and tests due before COD, the declarations, and the rules for declaring COD including ATS and tariff-based competitive bidding cases (p98–115).

Chapter 8, the System Operation Code, is the longest: operating philosophy, demand and generation estimation, adequacy of resources, annual and revised outage planning, demand control and load disconnection, system security (isolation of elements, UFR/df/dt schemes, load shedding, SPS, islanding), voltage limits, frequency control, reserves and the control hierarchy under which PRAS, SRAS and TRAS are procured (p116–142). It then covers operational planning studies and TTC/ATC declaration, system restoration and black-start procedures, real-time classification into normal/alert/emergency/extreme-emergency/restorative states, post-despatch analysis, event reporting timelines, load-crash response, reactive power management and periodic testing of power system elements (p143–163).

Chapter 9 reads the CEA flexible-operation framework into the state grid and sets a technical-minimum schedule for state generators with a compensation and annual reconciliation mechanism (p164–166). Chapter 10 is the Scheduling and Despatch Code: control-area jurisdiction, seller and buyer obligations, declared capacity and entitlement, requisitions and day-ahead, collective and real-time market timelines, revision of schedules on outage or constraint, curtailment priority order, SCUC/SCED, supply from alternate sources, energy metering and accounting, the reactive energy account and the State deviation pool (p167–195). Chapters 11 to 13 cover cross-boundary safety and Line Clear Permits, communication and data acquisition (RTU/SAS protocol, PMU, the SLDC real-time data list, cyber security and audit), and operational event, incident and accident reporting (p196–220).

Chapter 14 sets the compliance regime — annual self-audits, Commission-ordered third-party audits, and consequences of non-compliance including penalty and disconnection (p221–222); Chapter 15 provides for review, power to relax, power to remove difficulties, repeal and savings, and a clause stating the Code is not "change in law" under user agreements (p223–224). Eight annexures supply the planning data proformas, the third-party protection audit template, the frequency-response calculation method, protection standards, the Line Clear Permit formats and the RTU/SAS cyber-security architecture reference (p225–263).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Connectivity and GNA

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.