EXPLANATORY MEMORANDUM (EM) On Draft Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024

Explanatory memorandum to a draftReleased with the notice dated 7 Mar 2024

Draft

The draft has since been finalised as the Framework for Resource Adequacy Regulations, 2024.

Explanatory memorandum to the Framework for Resource Adequacy Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's explanatory memorandum for the draft Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024, issued alongside draft regulations notified on 7 January 2024 (p1, p5). It explains why the Commission proposes a structured resource-adequacy (RA) framework and how the draft regulations would be applied in Maharashtra, rather than setting out the operative legal text itself. It situates the draft in the December 2022 Ministry of Power amendment rules, the 2023 Indian Electricity Grid Code, CEA's RA planning guidelines and the Forum of Regulators' State Model Regulations, and records the working group process behind it (p4–5).

Section 1 (p6–7) argues for shifting demand assessment and forecasting to a scientific, mathematically driven approach at hourly granularity across long-, medium- and short-term horizons. It lists the inputs, consumer profiles, DSM and energy-efficiency effects, and policy drivers that distribution licensees should consider, and assigns state-level compilation to STU/SLDC.

Section 2 (p8–12) explains generation resource planning in three steps: capacity crediting, including a top-net-load-hours method and data requirements; the planning reserve margin tied to reliability metrics such as LOLP and NENS; and calculation of the state RA requirement and its allocation to distribution licensees. It includes illustrative, preliminary capacity-credit factors and deficit/allocation charts for Maharashtra and its licensees, while cautioning that the numbers are for discussion and may change (p9–12).

Section 3 (p13–14) covers procurement planning: least-cost resource-mix modelling, procurement type and tenure, and capacity trading or sharing within the state and, where a platform exists, between states.

Section 4 (p15) sets out an annual monitoring and compliance calendar and the basis for non-compliance charges, and points to a process flowchart. The EM states that the Commission may incorporate its requirements into the final regulations after stakeholder comments (p5).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document