MERC · Maharashtra Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2024 — Draft
Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
Draft regulationReleased with the notice dated 7 Mar 2024No. MERC/Tech/Regulation/ . dated __March , 2024
Draft
A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC regulation to establish a Maharashtra resource adequacy framework under the Electricity Act, 2003 (p1). It applies to distribution licensees, generating companies, MSLDC/SLDC, MSETCL/STU and other grid-connected entities and stakeholders in Maharashtra (p1–2). Commencement is tied to Gazette notification or a separate Commission notification; the draft leaves the notification number and date blank (p1, p19).
Chapter 1 sets the title, extent, objective, scope and definitions, including Resource Adequacy, Capacity Credit, EENS/NENS/LOLP, Planning Reserve Margin and the long/medium/short-term planning horizons (p1–3). Chapter 2 frames RA as a four-step cycle — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring/compliance — and requires distribution licensees to prepare medium- and short-term distribution resource adequacy plans (MT-DRAP and ST-DRAP) (p4).
Chapter 3 governs demand assessment. It requires distribution licensees to forecast demand and energy by consumer category and by hour or sub-hour using specified modelling approaches and scenario analysis, adjust for approved loss trajectories, and submit forecasts to MSLDC; MSLDC and STU aggregate state demand and send it to CEA, NLDC and RLDC (p4–7). Chapter 4 covers generation resource planning: mapping existing, upcoming and retiring resources with technical parameters; computing capacity-credit factors using a net-load approach for RE and resource-specific approaches for hydro and thermal; setting planning reserve margin by reliability indices; identifying the resource gap; and allocating the state and distribution licensee shares of national and state peak (p8–12). It also prescribes a long/medium/short-term contract mix and excludes day-ahead market purchases from RA contribution (p12).
Regulations 13–18 cover procurement: least-cost optimal resource mix, RE/RPO and storage procurement, procurement through central agencies, traders, exchanges, DEEP and PUShP, in-state optimisation, annual rolling plans, capacity sharing, prior Commission approval for new PPAs and permitted out-of-plan procurement in defined circumstances (p13–16). Chapter 6 makes MSLDC levy a non-compliance charge for RA shortfall, linked to capacity charges and not recoverable through the ARR (p16). Chapter 7 addresses data sharing, annual timelines, website publication and dedicated RA and procurement cells (p16–18). Chapter 8 contains directions, deviation, relaxation, amendment and difficulty-removal powers (p19). Annexure-I provides data templates for demand forecasts, hourly load and RE data, generating-station characteristics and peak and energy projections (p20–23).
Read with this
The regulation
- Date not statedFramework for Resource Adequacy Regulations, 2024
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
- Released with the notice dated 7 Mar 2024Explanatory memorandum: Draft Framework for Resource Adequacy Regulations, 2024 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.