Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
4 documents match “storage drawal T-GNA”.
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated
- ISTS drawal at HVDC substations have been combined at … › Modalities of Solar Hour Access and Non-Solar Hour Access… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 1. Short Title and Commencement › 2. Definition… (ii) the agency designated for T-GNA for bilateral transactions which shall be RLDC of the region where point of drawal is located, for the purpose of Regulations 26 to 36 of these regulations; …
3 matching passages in this document
Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
- 9. Amendment to Regulation 11 of the Principal Regulations › 10. Amendment to Regulation 12 of the Principal Regulations… transmission deviation in a time block shall be net metered drawal in excess of sum of GNA and T-GNA for all drawee DICs which are intra-State entities in that State: Provided that, where a State has net metered injection in a time …
- 9. Amendment to Regulation 11 of the Principal Regulations › 10. Amendment to Regulation 12 of the Principal Regulations… transmission deviation in a time block shall be net metered drawal in excess of sum of [scheduled drawl under GNARE and T-GNARE from identified sources as specified in subclauses (i) to (iii) under Regulation 13(2) of the Principal …
3 matching passages in this document
Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
Draft- CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI › (16) Regulation of access to defaulting entitiesT-GNA, including already approved T-GNA, for the sale and purchase of electricity through short term contracts, including in the power exchange, shall be regulated entirely: Provided further that the NLDC may, under exceptional …
- 2.0 Objective › 4.0 Scheduling… shall be eligible to buy power at busbar of generating station under T-GNA as a trading licensee. 4.9. In the case of States with free power share from CHGS (s), if the concerned State Government and distribution licensee of the State …
3 matching passages in this document
Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft
Draft- 2. Amendment to Regulation 2 of the Principal Regulations › 3. Amendment to Regulation 12 of the Principal Regulations… which is an intra-State entity of a State obtains GNARE or T-GNARE, as permitted under GNA Regulations, transmission deviation for the State in a time block shall be net metered drawal in excess of sum of (GNA and T-GNA for all drawee …
- 2. Amendment to Regulation 2 of the Principal Regulations › 3. Amendment to Regulation 12 of the Principal Regulations… if permitted under the GNA Regulations, the transmission deviation shall be computed as net metered drawal, in a time block in excess of the sum of 'GNA to the inter-State transmission system and Access with STU system': …
3 matching passages in this document