Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026

Draft amendmentDated 31 Jul 2026No. L-1/250/2019/CERC dated 31.07.2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification dated 31.07.2026 in which CERC proposes the Fifth Amendment to its 2020 regulations on sharing inter-State transmission charges and losses (p1). It is made under section 178 read with Part V of the Electricity Act 2003 and states that it takes effect from publication in the official Gazette (p1).

Clause 2 adds a definition of Renewable Energy Implementing Agency (REIA), taking the meaning given in the GNA Regulations (p1).

Clause 3 rewrites how transmission deviation is computed for intra-State drawee entities that obtain GNARE or T-GNARE, and for drawee entities with dual STU/CTU connectivity — covering both States that are net drawal and net injection in a time block, dealing with interface-meter readings, and requiring the STU to share Access-with-STU details with NLDC and CTU; it also renumbers and deletes a proviso in Regulation 12(1)(d) (p1–2).

Clause 4 carries the substance. It adds a transmission-charge waiver for battery storage installed as an integral part of an RE generating station or hydro pumped storage, including where the storage was added later as a source change, with the whole station scheduled as one entity and the waiver tenure measured from COD (p2–3). It assigns BESS charging cycles between the two Table 2 categories and directs NLDC to issue data-collection and accounting procedures (p3). It lets storage buying through Green Day Ahead Market collective transactions count that energy toward the 51% energy requirement on a power-exchange certificate, with a special computation for hydro pumped storage falling short (p3). It restructures the 'whichever is higher' cross-reference in Regulation 13(2)(f) (p4), and inserts new sub-clauses (h-i) and (h-ii) creating a waiver trajectory for wind, solar and hybrid projects delayed by transmission unavailability, keyed to the firm start date of connectivity in Table 6, subject to contract and submission deadlines and a binding election between waiver routes (p4–5).

Clause 5 makes the Implementing Agency publish revised detailed procedures within 60 days of notification (p5). Clause 6 aligns the GNARE and T-GNARE definitions in Annexure-III with the GNA Regulations, deletes two provisos and corrects a cross-reference (p6). Clause 7 inserts a new Regulation 29 empowering the Commission to issue suo moto orders and practice directions (p6). A Note lists the gazette publication dates of the Principal Regulations and the First to Fourth Amendments, including the 2025 errata (p6–7).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Energy storage deployment, Deviation settlement (DSM)

Read with this

Other copies of these documents (5)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.