Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2026

Draft amendmentDated 21 Sep 2026No. L-1/265/2022/CERC dated 21.09.2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification proposing the Indian Electricity Grid Code (Second Amendment) Regulations, 2026, dated 21.09.2026 and signed by the Secretary (p1). It works entirely by amending the IEGC Regulations, 2023, and is organised as twenty numbered paragraphs.

Definitions and congestion charging. Para 2 inserts new definitions into Regulation 3 — Central Hydro Generating Station, congestion charge, and a 'default trigger date' tied to non-payment of dues or failure to replenish a payment security mechanism (p1). Para 11 inserts a new Regulation 30A creating a congestion-charge regime: who pays and who receives, the notice process before the charge is applied and withdrawn, weekly RPC statements, deposit into the pool account, interest on late payment, release by RLDCs, and a direction to NLDC to frame a detailed levy procedure within 60 days of notification for the Commission's approval (p7–10). Para 17 repeals the 2009 CERC (Measures to relieve congestion in real time operation) Regulations, with savings keeping the old rate and detailed procedure alive until replaced (p15–16).

Commissioning, trial runs and scheduling. Paras 3–9 recast the infirm-power, trial-run and COD provisions: extension of the interchange window, revised capacity bands and instalment rules for trial runs of generating stations, ESS and pumped storage, a new Regulation 25A on scheduling of infirm power including pre-COD sale to contracted buyers, and COD treatment for pumped storage units (p2–7). Paras 13–15 amend Regulations 46–48 on unit shutdown (USD) timelines, USD planning and buyer consent for sharing net savings (p12–14). Para 16 shortens the day-ahead revision timeline in Regulations 48 and 49 in two phases, with the second phase separately dated to 1.04.2027 (p14–15).

Access, default and State free power. Para 12 amends Regulation 45, adding peak-hour declared-capacity discipline for thermal stations, a new clause regulating access for defaulting entities in a progressive ladder from T-GNA to GNA to other contracts, and a new clause letting State Governments sell their free power share from the bus bar of Central Hydro Generating Stations (p10–12). Para 20 supplies Annexure-8, the procedure for scheduling, accounting and deviation settlement of that free power share, and Annexure-9, the modalities for day-ahead scheduling from units identified for decommit (p16–22). Paras 18–19 make consequential changes to Annexures 3 and 4 (p16). The regulations take effect on Gazette publication except the Para 16(B) changes (p1).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Congestion and curtailment, Scheduling and despatch

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document