Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2023

AmendmentDated 7 Feb 2023No. L-1/250/2019/CERC dated 7.02.2023

Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment, 2023 to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, issued 7 February 2023 (p1). It does not restate the 2020 framework; it rewrites it in the vocabulary of the GNA regime, replacing Long Term Access / Medium Term Open Access references with GNA, GNARE, T-GNA and T-GNARE throughout, and aligning the definition of Associated Transmission System to the GNA Regulations, 2022 (p1–2). It also defines 'Drawee DIC' and imports the Electricity (Late Payment Surcharge and Related Matters) Rules, 2022 as the governing payment-default regime (p2). Commencement is deferred — the regulations take effect from a date the Commission is yet to notify, which is not printed (p1).

Regulations 5 to 8 are recast so that Yearly Transmission Charges for the national, regional, AC-BC and AC-UBC components are shared by drawee DICs in proportion to their GNA and GNARE quantum, with Regulation 9 specifying how the Implementing Agency aggregates drawal-node charges to determine a State's AC-UBC charge and how licencees and regional entities holding separate GNA are carved out of the State aggregate (p3–5). Regulation 11 is renamed for T-GNA and T-GNARE and lays down a State-wise, monthly published T-GNA rate with a reimbursement mechanism; Regulation 12 sets out how transmission deviation is computed for each class of entity and the formula for the transmission deviation rate (p5–8). Regulation 13 is the substantive heart: it revises the waiver of transmission charges for solar, wind, hybrid, hydro, pumped storage and battery storage, states the eligibility windows and waiver periods attached to commercial operation dates and PPA/construction dates, and adds who pays transmission charges when a connectivity grantee, dedicated line, intra-State system, ESS or renewable park is delayed (p8–14). Regulations 14 to 25 cover billing, late payment surcharge and security, and the Implementing Agency's obligation to publish revised procedures within 45 days (p14–17). Annexure-III supplies the formulae for computing waiver percentages and the resulting bill adjustment for GNA/GNARE and for T-GNA/T-GNARE holders (p18–21).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Energy storage deployment

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document