Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

Consolidated copyDated 7 Jun 2022No. L-1/261/2021/CERC dated 7.6.2022

A consolidated copy of the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022, published by CERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 28 of 90. Check the regulator's original before you rely on it.

These are the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, issued on 7 June 2022 (p1). They create one framework for connecting generators, storage and other entities to the inter-State transmission system (ISTS) and for open access through General Network Access (GNA). The preamble says the purpose is to consolidate the regulations on the subject (p1). Commencement is left to a future CERC notification, and different regulations may start on different dates (p1).

Chapter 1 (pp1–6) is the dictionary: it defines GNA and a renewable-only variant (GNARE), temporary GNA (T-GNA/T-GNARE), connectivity and connectivity grantee, energy storage systems, renewable generating and hybrid stations, lead generator/lead ESS, nodal agency responsibilities, and the solar-hours/non-solar-hours access concepts.

Chapter 2 (pp6–9) sets the common application machinery — online filing, the application fee and its exemption for STUs applying for GNA, scrutiny windows, deficiency correction, and the consequences of withdrawing an application at different stages, including forfeiture of fees and bank guarantees.

Chapter 3 (pp9–28 and continuing) is the connectivity code. It sets eligibility, including the general 50 MW threshold, a 25 MW threshold for the North Eastern Region and Sikkim, and 5 MW paths through another generator's electrical system or on the BBMB network (pp9–11). It prescribes what an application must contain — land documents or a bank guarantee in lieu, letters of award or PPAs for renewable projects, sharing agreements and technical data (pp14–18). The Nodal Agency carries out the interconnection study, identifies the Associated Transmission System, and issues in-principle grant within 60 or 90 days depending on whether augmentation is needed (pp20–21). Connectivity bank guarantees are split into Conn-BG1, Conn-BG2 (per terminal bay, banded by voltage) and Conn-BG3 (per MW) (pp21–22). Final grant, the two-stage Connectivity Agreement (Cat-1 and Cat-2), change of renewable source, and monitoring follow (pp23–27). The pages end in Regulation 11A, which imposes conditions subsequent on renewable and storage grantees — land documents and financial closure with timelines and release of bank guarantees (pp27–28).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Procedures and orders made under it

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document